Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 1 of 6  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events XYPosition Cooling Data Text Attachments
  29   Sun Jun 7 11:38:04 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw00715000  GoodTLU Run 46

Threshold 8b

Offset 601
  
  33   Sun Jun 7 13:18:20 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw008536701NoGoodFIRST GOOD RUN WITH SVD3 plus telescope

EUDET Run 49

Mimosa Threshold 7
  
  37   Sun Jun 7 15:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw050500002NoGoodRUN WITH SVD3 plus telescope

EUDET Run 50

Mimosa Threshold 7
  
  40   Sun Jun 7 20:03:09 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw051500003NoGoodRUN WITH SVD3 plus telescope

EUDET Run 51

Mimosa Threshold 7
  
  41   Sun Jun 7 20:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw052500004NoGoodRUN WITH SVD3 plus telescope

EUDET Run 52

Mimosa Threshold 7
  
  42   Sun Jun 7 20:37:56 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw053500005 GoodRUN WITH SVD3 plus telescope

EUDET Run 53

Mimosa Threshold 6
  
  45   Sun Jun 7 23:09:46 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0541200006NoGoodRUN WITH SVD3 plus telescope

EUDET Run 54

Mimosa Threshold 6
  
  46   Mon Jun 8 01:28:58 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0554100007NoGoodRUN WITH SVD3 plus telescope

EUDET Run 55

Mimosa Threshold 6
  
  48   Mon Jun 8 09:37:30 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw056500008NoGoodRUN WITH SVD3 plus telescope

EUDET Run 56

Mimosa Threshold 6
 run000056-fitter-residuals.pdf 
  49   Mon Jun 8 10:47:44 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw057500009NoGoodRUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6
 run000057-fitter-residuals.pdf 
  51   Mon Jun 8 11:57:14 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0585000010NoGoodRUN WITH SVD3 plus telescope

EUDET Run 58

Mimosa Threshold 6
  
  53   Mon Jun 8 15:03:53 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and FEI4 WORKING5919000  UnknownTestrun with the FEI4 working for the first
time. 

Lessons learned about the configuration:
  
  21   Sat Jun 6 16:17:52 2015 Benedikt WürknerSVD3 (H6B)hardware runhw0025000  GoodTable: 100:70

Bias: +-50V

Run to confirm trigger delay
  
  22   Sat Jun 6 16:18:48 2015 Benedikt WürknerSVD3 (H6B)hardware runhw00350000  UnknownTable: 100:70

Bias: +-50V

Run to confirm trigger delay
  
  26   Sun Jun 7 00:58:33 2015 Benedikt WürknerSVD3 (H6B)hardware runhw006   CrapTable: 100:70

Bias: +-50V

600 pedestal
  
  24   Sat Jun 6 21:00:15 2015 Benedikt WürknerSVD3 (H6B)first hardware run with TLU and Telescopehw004117171  UnknownTable: 100:70

Bias: +-50V

600 pedestal
  
  20   Sat Jun 6 16:14:36 2015 Benedikt WürknerSVD3 (H6B)calibration run and setup informationcal01   UnknownCalibration Run with +- 50V Bias with higher
compliance since the p-side draws more current
than expected (23muA by the MAMBO)
  
  50   Mon Jun 8 11:33:24 2015 Thomas Bergauercommonbeam profile    Unknown120GeV hadrons, beam config H6A.BELLE.003  Beamprofile.png 
  3   Wed Jun 3 17:23:07 2015 Thomas BergauerBelle II FADC (H6A)XY stage positions    Unknownx-Achse: positiv Richtung Saleve (counting
room)
 L5_Class_B-.PNG 
  36   Sun Jun 7 14:44:29 2015 Thomas BergauerSVD3 (H6B)XY Stage and DUT Positions    UnknownCoordinate system:

pos x-Direction = Jura side

pos y-Direction = Down
 FWD-BWD.PNGapv-numbering.jpgFWD-BWD_Bemaßung.PNG 
ELOG V3.1.5-fc6679b