Sun Jun 7 12:12:00 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0048, 53356, , , Unknown
|
Telescope alone |
Sun Jun 7 12:10:24 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold8b test run , 0046, 14399, , , Unknown
|
Telescope in combination with SVD3 |
Mon Jun 8 18:08:49 2015, Thomas Bergauer, SVD3 (H6B), Telescope online monitor, , , , , Unknown
|
a working version of the EUDET online monitor (which works also with the FE-I4) is at the following location
~/BELLETEST/eudaq-neu/build/monitors/onlinemon$ ./OnlineMon.exe -sc 0 -f /home/telescope/eudaq/data/run000060.raw |
Fri Jun 12 17:08:23 2015, Benedikt Würkner, SVD3 (H6B), Telescope with FEI4, 80, ~30k, , No, Good
|
Threshold 6
Testrun to see how the telescope behaves without a DUT to test if there is an increased amount of multiple scattering after the aluminum planes of the FW and BW module.
This time with the upstream FEI4 plane |
Fri Jun 12 16:52:52 2015, Benedikt Würkner, SVD3 (H6B), Telescope without DUT, 76, ~30k, , No, Good
|
Threshold 6
Testrun to see how the telescope behaves without a DUT to test if there is an increased amount of multiple scattering after the aluminum planes of the FW and BW module.
|
Tue Jun 9 11:20:25 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 65, 50000, 2, No, Unknown
|
Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66 for details.
Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)
Producer.TLU Config Change:
|
Tue Jun 9 14:33:50 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 67, 50000, 2, No, Unknown
|
Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one) see http://elog.hephy.at/testbeam-SPS2015/66 for details.
Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)
Producer.TLU Config Change:
|
Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown
|
Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down
Zero-point is in the top right corner in Beam direction
absolute Position of PI Stages:
Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )
Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)
Pos 3: x=38.6 mm, y=84 mm
Pos 4: x=130.7 mm, y=84 mm
Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)
Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)
Pos 7: x= 30.5 mm, y= 79 mm (wide side center)
Pos 8: x=136.08 mm, y= 79 mm (narrow side center)
Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)
Pos 10: x= 136.08mm, y=68.9 mm (narrow side down) |
Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown
|
x-Achse: positiv Richtung Saleve (counting room)
y-Achse: positiv Richtung UNTEN!!
position of laddertestbox xy stages:
Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6
Mitte Sensor:
Pos 1: (mitte BWD sensor): x=144.74, y=80.8
Pos 2: (mitte Origami -z): x=269.62, y=80.8
Pos 3: (mitte Origami ce): x=394.42, y=80.8
Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8
Ecke:
Pos 5 (Ecke BWD sensor): x=92.3, y=105.6
Pos 6 (Ecke Origami -z): x=217.18, y=105.6
Pos 7 (Ecke Origami ce): x=342.06, y=105.6
Pos 8 (Ecke FWD sensor): x=467,62, y=56,3
Pos 9 (Ecke FWD sensor): x=568,33 y=64,48 |
Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown
|
120GeV hadrons, beam config H6A.BELLE.003 |
Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown
|
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)
|
Sat Jun 6 21:00:15 2015, Benedikt Würkner, SVD3 (H6B), first hardware run with TLU and Telescope, hw004, 117171, , , Unknown
|
Table: 100:70
Bias: +-50V
600 pedestal
0 offset (at the beginning)
Started APVDAQ and waited till 600 were taken then started EUDAQ
EUDAQ Run 21
Mimosa Thresholds lvl 6 |
Sat Jun 6 16:17:52 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw002, 5000, , , Good
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap
|
Table: 100:70
Bias: +-50V
600 pedestal
0 offset (at the beginning)
Started APVDAQ and waited till 600 were taken then started EUDAQ
EUDAQ Run 24
Mimosa Thresholds lvl 7 |
Mon Jun 8 15:03:53 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and FEI4 WORKING, 59, 19000, , , Unknown
|
Testrun with the FEI4 working for the first time.
Lessons learned about the configuration:
EnableDUTVeto needs to be set for the FEI4 to allow it to work
HandShakeMode needs to be enabled for the FEI4 as well
"Enable RJ45 input during scans" needs to be enabled for the USB-controller |
Sun Jun 7 11:38:04 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw007, 15000, , , Good
|
TLU Run 46
Threshold 8b
Offset 601 |
Sun Jun 7 13:18:20 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw008, 53670, 1, No, Good
|
FIRST GOOD RUN WITH SVD3 plus telescope
EUDET Run 49
Mimosa Threshold 7
Offset APVDAQ-TLU Event number: 601
Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite) |
Sun Jun 7 15:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw050, 50000, 2, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 50
Mimosa Threshold 7
Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) |
Sun Jun 7 20:03:09 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw051, 50000, 3, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 51
Mimosa Threshold 7
Pos 3: x=38.6 mm, y=84 mm |
|