Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown
|
Information concerning the SVD3 setup during a beam test
In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies.
Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password |
Wed Jun 3 10:48:42 2015, Benedikt Würkner, common, Networking, , , , , Unknown
|
WLAN Router:
SSID: Hephy
password: 20supersecret14
DHCP Range: 192.168.0.200 to 239 |
Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown
|
x-Achse: positiv Richtung Saleve (counting room)
y-Achse: positiv Richtung UNTEN!! |
Thu Jun 4 14:15:50 2015, Hao Yin, Belle II FADC (H6A), FIR, 001, , , , Good
|
FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched. |
Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown
|
|
Fri Jun 5 12:02:29 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 001, , , , Good
|
room temp max subevent at 2. with lat = 96 |
Fri Jun 5 12:03:34 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 002, , , , Good
|
lat = 97 to a greater range of lat scan |
Fri Jun 5 19:55:00 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 003, , , , Unknown
|
lat = 98
room temp
pedestalrun 003 |
Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown
|
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)
|
Sat Jun 6 23:30:29 2015, Benedikt Würkner, Belle II FADC (H6A), Hardware, 009, , , , Good
|
room temp, FIRRun002, PedestalRun005, room temp
target: FW, pos 9 (p-0, n-128*4) |
Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap
|
Table: 100:70
Bias: +-50V
600 pedestal |
Sun Jun 7 10:39:56 2015, Hao Yin, Belle II FADC (H6A), Calibration, 002, , , , Good
|
Cooled!
FIRRun002, pedestalrun006; temp see attachment in pedestalrun006
|
Sun Jun 7 13:19:19 2015, Hao Yin, Belle II FADC (H6A), Hardware, 010, , , , Good
|
cooled
FIRRun002, PedestalRun006 (temp enty)
target: BW, pos 1 |
Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown
|
Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down |
Sun Jun 7 20:02:40 2015, Hao Yin, Belle II FADC (H6A), Cooling Box Emergency break, , , , , Unknown
|
Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded. |
Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown
|
120GeV hadrons, beam config H6A.BELLE.003 |
Mon Jun 8 16:53:13 2015, Benedikt Würkner, SVD3 (H6B), EUTelescope Fitter not working investigation, , , , , Unknown
|
Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating
different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system.
Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope |
Mon Jun 8 18:08:49 2015, Thomas Bergauer, SVD3 (H6B), Telescope online monitor, , , , , Unknown
|
a working version of the EUDET online monitor (which works also with the FE-I4) is at the following location
~/BELLETEST/eudaq-neu/build/monitors/onlinemon$ ./OnlineMon.exe -sc 0 -f /home/telescope/eudaq/data/run000060.raw |
Mon Jun 8 20:13:59 2015, Hao Yin, Belle II FADC (H6A), Hardware, 017, , 5, Yes, Good
|
cooled (see attachment) in -21.24 out -18.54
cooling supply emty at ~24:00 ie first 30k is cooled.
FIRRun002, PedestalRun006 |
Tue Jun 9 09:33:33 2015, Hao Yin, Belle II FADC (H6A), Calibration, 003, , , , Good
|
room temp
FIRRun002,
pedestalrun006; |
|