Entry  Sun Jun 7 11:38:04 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw007, 15000, , , Good 

TLU Run 46

Threshold 8b

Offset 601

Entry  Sun Jun 7 13:18:20 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw008, 53670, 1, No, Good 

FIRST GOOD RUN WITH SVD3 plus telescope

EUDET Run 49

Mimosa Threshold 7

Offset APVDAQ-TLU Event number: 601

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite)

Entry  Sun Jun 7 15:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw050, 50000, 2, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 50

Mimosa Threshold 7

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Entry  Sun Jun 7 20:03:09 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw051, 50000, 3, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 51

Mimosa Threshold 7

Pos 3: x=38.6 mm, y=84 mm

Entry  Sun Jun 7 20:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw052, 50000, 4, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 52

Mimosa Threshold 7

Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16

Entry  Sun Jun 7 20:37:56 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw053, 50000, 5, , Good 

RUN WITH SVD3 plus telescope

EUDET Run 53

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Entry  Sun Jun 7 23:09:46 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw054, 120000, 6, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 54

Mimosa Threshold 6

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Entry  Mon Jun 8 01:28:58 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw055, 410000, 7, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 55

Mimosa Threshold 6

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Entry  Mon Jun 8 09:37:30 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw056, 50000, 8, No, Good run000056-fitter-residuals.pdf

RUN WITH SVD3 plus telescope

EUDET Run 56

Mimosa Threshold 6

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Entry  Mon Jun 8 10:47:44 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw057, 50000, 9, No, Good run000057-fitter-residuals.pdf

RUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Entry  Mon Jun 8 11:57:14 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw058, 50000, 10, No, Good 

RUN WITH SVD3 plus telescope

EUDET Run 58

Mimosa Threshold 6

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Entry  Mon Jun 8 15:03:53 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and FEI4 WORKING, 59, 19000, , , Unknown 

Testrun with the FEI4 working for the first time. 

Lessons learned about the configuration:

EnableDUTVeto needs to be set for the FEI4 to allow it to work

HandShakeMode needs to be enabled for the FEI4 as well

"Enable RJ45 input during scans" needs to be enabled for the USB-controller

Entry  Sat Jun 6 16:17:52 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw002, 5000, , , Good 

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

Entry  Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown 

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

Entry  Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap 

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 24

Mimosa Thresholds lvl 7

Entry  Sat Jun 6 21:00:15 2015, Benedikt Würkner, SVD3 (H6B), first hardware run with TLU and Telescope, hw004, 117171, , , Unknown 

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 21

Mimosa Thresholds lvl 6

Entry  Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown 

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 

Entry  Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown Beamprofile.png

120GeV hadrons, beam config H6A.BELLE.003

Entry  Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown L5_Class_B-.PNG

x-Achse: positiv Richtung Saleve (counting room)

y-Achse: positiv Richtung UNTEN!!

 

position of laddertestbox xy stages:

Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6

Mitte Sensor:

Pos 1: (mitte BWD sensor): x=144.74, y=80.8

Pos 2: (mitte Origami -z): x=269.62, y=80.8

Pos 3: (mitte Origami ce): x=394.42, y=80.8

Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8

Ecke:

Pos 5 (Ecke BWD sensor): x=92.3, y=105.6

Pos 6 (Ecke Origami -z): x=217.18, y=105.6

Pos 7 (Ecke Origami ce): x=342.06, y=105.6

Pos 8 (Ecke FWD sensor): x=467,62, y=56,3 

Pos 9 (Ecke FWD sensor): x=568,33 y=64,48

Entry  Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown FWD-BWD.PNGapv-numbering.jpgFWD-BWD_Bemaßung.PNG

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)