| ID | Date | Author | Project | Subject  | Run Number | Events | XYPosition | Cooling | Data | 
| 29 | Sun Jun  7 11:38:04 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw007 | 15000 |  |  | Good | 
| TLU Run 46 Threshold 8b Offset 601 | 
| 33 | Sun Jun  7 13:18:20 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw008 | 53670 | 1 | No | Good | 
| FIRST GOOD RUN WITH SVD3 plus telescope EUDET Run 49 Mimosa Threshold 7 Offset APVDAQ-TLU Event number: 601 Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite) | 
| 37 | Sun Jun  7 15:03:31 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw050 | 50000 | 2 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 50 Mimosa Threshold 7 Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  | 
| 40 | Sun Jun  7 20:03:09 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw051 | 50000 | 3 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 51 Mimosa Threshold 7 Pos 3: x=38.6 mm, y=84 mm | 
| 41 | Sun Jun  7 20:03:31 2015 | Thomas Bergauer | SVD3 (H6B) | hardware run with TLU and Telescope | hw052 | 50000 | 4 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 52 Mimosa Threshold 7 Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16 | 
| 42 | Sun Jun  7 20:37:56 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw053 | 50000 | 5 |  | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 53 Mimosa Threshold 6 Pos 5: x=30.5 mm, y= 99.74 mm (wide side top) | 
| 45 | Sun Jun  7 23:09:46 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw054 | 120000 | 6 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 54 Mimosa Threshold 6 Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top) | 
| 46 | Mon Jun  8 01:28:58 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw055 | 410000 | 7 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 55 Mimosa Threshold 6 Pos 7: x= 30.5 mm, y= 79 mm (wide side center) | 
| 48 | Mon Jun  8 09:37:30 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw056 | 50000 | 8 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 56 Mimosa Threshold 6 Pos 8: x=136.08 mm, y= 79 mm (narrow side center) | 
| Attachment 1: run000056-fitter-residuals.pdf | 
| 49 | Mon Jun  8 10:47:44 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw057 | 50000 | 9 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 57 Mimosa Threshold 6 Pos 9: x=30.5 mm, y= 60.67 mm (wide side down) | 
| Attachment 1: run000057-fitter-residuals.pdf | 
| 51 | Mon Jun  8 11:57:14 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and Telescope | hw058 | 50000 | 10 | No | Good | 
| RUN WITH SVD3 plus telescope EUDET Run 58 Mimosa Threshold 6 Pos 10: x= 136.08mm, y=68.9 mm (narrow side down) | 
| 53 | Mon Jun  8 15:03:53 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run with TLU and FEI4 WORKING | 59 | 19000 |  |  | Unknown | 
| Testrun with the FEI4 working for the first time.  Lessons learned about the configuration: EnableDUTVeto needs to be set for the FEI4 to allow it to work HandShakeMode needs to be enabled for the FEI4 as well "Enable RJ45 input during scans" needs to be enabled for the USB-controller | 
| 21 | Sat Jun  6 16:17:52 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run | hw002 | 5000 |  |  | Good | 
| Table: 100:70 Bias: +-50V Run to confirm trigger delay | 
| 22 | Sat Jun  6 16:18:48 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run | hw003 | 50000 |  |  | Unknown | 
| Table: 100:70 Bias: +-50V Run to confirm trigger delay | 
| 26 | Sun Jun  7 00:58:33 2015 | Benedikt Würkner | SVD3 (H6B) | hardware run | hw006 |  |  |  | Crap | 
| Table: 100:70 Bias: +-50V 600 pedestal 0 offset (at the beginning) Started APVDAQ and waited till 600 were taken then started EUDAQ EUDAQ Run 24 Mimosa Thresholds lvl 7 | 
| 24 | Sat Jun  6 21:00:15 2015 | Benedikt Würkner | SVD3 (H6B) | first hardware run with TLU and Telescope | hw004 | 117171 |  |  | Unknown | 
| Table: 100:70 Bias: +-50V 600 pedestal 0 offset (at the beginning) Started APVDAQ and waited till 600 were taken then started EUDAQ EUDAQ Run 21 Mimosa Thresholds lvl 6 | 
| 20 | Sat Jun  6 16:14:36 2015 | Benedikt Würkner | SVD3 (H6B) | calibration run and setup information | cal01 |  |  |  | Unknown | 
| Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)   | 
| 50 | Mon Jun  8 11:33:24 2015 | Thomas Bergauer | common | beam profile |  |  |  |  | Unknown | 
| 120GeV hadrons, beam config H6A.BELLE.003 | 
| Attachment 1: Beamprofile.png | 
|  | 
| 3 | Wed Jun  3 17:23:07 2015 | Thomas Bergauer | Belle II FADC (H6A) | XY stage positions |  |  |  |  | Unknown | 
| x-Achse: positiv Richtung Saleve (counting room)
 y-Achse: positiv Richtung UNTEN!!
   position of laddertestbox xy stages: Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6 Mitte Sensor: Pos 1: (mitte BWD sensor): x=144.74, y=80.8 Pos 2: (mitte Origami -z): x=269.62, y=80.8 Pos 3: (mitte Origami ce): x=394.42, y=80.8 Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8 Ecke: Pos 5 (Ecke BWD sensor): x=92.3, y=105.6 Pos 6 (Ecke Origami -z): x=217.18, y=105.6 Pos 7 (Ecke Origami ce): x=342.06, y=105.6 Pos 8 (Ecke FWD sensor): x=467,62, y=56,3  Pos 9 (Ecke FWD sensor): x=568,33 y=64,48 | 
| Attachment 1: L5_Class_B-.PNG | 
|  | 
| 36 | Sun Jun  7 14:44:29 2015 | Thomas Bergauer | SVD3 (H6B) | XY Stage and DUT Positions |  |  |  |  | Unknown | 
| Coordinate system: pos x-Direction = Jura side pos y-Direction = Down Zero-point is in the top right corner in Beam direction   absolute Position of PI Stages: Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite ) Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite)  Pos 3: x=38.6 mm, y=84 mm Pos 4: x=130.7 mm, y=84 mm Pos 5: x=30.5 mm, y= 99.74 mm (wide side top) Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top) Pos 7: x= 30.5 mm, y= 79 mm (wide side center) Pos 8: x=136.08 mm, y= 79 mm (narrow side center) Pos 9: x=30.5 mm, y= 60.67 mm (wide side down) Pos 10: x= 136.08mm, y=68.9 mm (narrow side down) | 
| Attachment 1: FWD-BWD.PNG | 
|  | 
| Attachment 2: apv-numbering.jpg | 
|  | 
| Attachment 3: FWD-BWD_Bemaßung.PNG | 
|  |