Entry  Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown spider-config.jpg

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Entry  Wed Jun 3 10:48:42 2015, Benedikt Würkner, common, Networking, , , , , Unknown 

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.174.109 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Benni mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.124 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 SVD3 DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22), VNC(5900)  SSH(9004), VNC(9012)
192.168.0.20 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.19 Cooling control PC VNC(5900) VNC(9011)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
137.138.113.254 Aida PC   vnc(5900)

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

Entry  Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown L5_Class_B-.PNG

x-Achse: positiv Richtung Saleve (counting room)

y-Achse: positiv Richtung UNTEN!!

 

position of laddertestbox xy stages:

Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6

Mitte Sensor:

Pos 1: (mitte BWD sensor): x=144.74, y=80.8

Pos 2: (mitte Origami -z): x=269.62, y=80.8

Pos 3: (mitte Origami ce): x=394.42, y=80.8

Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8

Ecke:

Pos 5 (Ecke BWD sensor): x=92.3, y=105.6

Pos 6 (Ecke Origami -z): x=217.18, y=105.6

Pos 7 (Ecke Origami ce): x=342.06, y=105.6

Pos 8 (Ecke FWD sensor): x=467,62, y=56,3 

Pos 9 (Ecke FWD sensor): x=568,33 y=64,48

Entry  Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown IMG_20150604_184442.jpgIMG_20150604_184451.jpgIMG_20150604_184516.jpg
 
Entry  Fri Jun 5 19:55:00 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 003, , , , Unknown 

lat = 98

room temp

pedestalrun 003

Entry  Fri Jun 5 23:38:51 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 005, 10000, , , Unknown 

Readjust after cooling box.

room temp, firrun002
 

Entry  Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown 

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 

Entry  Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown 

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

Entry  Sat Jun 6 21:00:15 2015, Benedikt Würkner, SVD3 (H6B), first hardware run with TLU and Telescope, hw004, 117171, , , Unknown 

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 21

Mimosa Thresholds lvl 6

Entry  Sun Jun 7 10:36:38 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 006, 10000, , , Unknown Pos1.PNG

Cooled, Temp see attachment
FirRun002
 

Entry  Sun Jun 7 12:10:24 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold8b test run , 0046, 14399, , , Unknown 

Telescope in combination with SVD3

Entry  Sun Jun 7 12:11:42 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0047, 38175, , , Unknown 

Telescope alone

Entry  Sun Jun 7 12:12:00 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0048, 53356, , , Unknown 

Telescope alone

Entry  Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown FWD-BWD.PNGapv-numbering.jpgFWD-BWD_Bemaßung.PNG

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Entry  Sun Jun 7 15:59:05 2015, Hao Yin, Belle II FADC (H6A), Hardware, 012, 50000, , , Unknown Pos3.PNG

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 2

cooling box emergency break ... ie about the last 1-10 k not useable.

Entry  Sun Jun 7 20:02:40 2015, Hao Yin, Belle II FADC (H6A), Cooling Box Emergency break, , , , , Unknown 

Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded.

Entry  Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown Beamprofile.png

120GeV hadrons, beam config H6A.BELLE.003

Entry  Mon Jun 8 15:03:53 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and FEI4 WORKING, 59, 19000, , , Unknown 

Testrun with the FEI4 working for the first time. 

Lessons learned about the configuration:

EnableDUTVeto needs to be set for the FEI4 to allow it to work

HandShakeMode needs to be enabled for the FEI4 as well

"Enable RJ45 input during scans" needs to be enabled for the USB-controller

Entry  Mon Jun 8 15:49:23 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 60, 50000, 10, No, Unknown Screenshot_2015-06-08_17.59.50.pngScreenshot_2015-06-08_17.41.03.png

Hardware run with FEI4, Telescope and FW&BW Modules

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

 

Bilder: Hitmap FE-I4 und Correlation zw. Mimosa und FE-I4

Entry  Mon Jun 8 16:53:13 2015, Benedikt Würkner, SVD3 (H6B), EUTelescope Fitter not working investigation, , , , , Unknown nice-alignment.pngbad-alignment.png

Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system. 

Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope planes behind the DUTs. This can be easily checked by looking at the PreAligner plots in the -hitmaker-histo.root file.

It look something like this:

and not like this:

 

Run number offset value Comment
49 -1  
50 -1 Expected default value. EORE=49401
51 -1 Expected default value. EORE=49400
52 -1 Checked -1 EORE= 49401
53 -1 Checked -1 EORE= 49401
54 -1 Checked -1 EORE= 119401, 
55 -1 Checked -1 EORE= 409388
56 -1 Checked -1 EORE= 49392
57 -1 Checked -1 EORE= 49377
58 -1 Checked -1 EORE= 49397

 

Run Position x-Table x-telescope FW x-telescope BW
49 1 100 -13,7 -16,7
50 2 69,3 17 14
51 3 38,6 47,7 44,7
52 4 130,7 -44,4 -47,4
53 5 30,5 55,8 52,8
54 6 136,8 -50,5 -53,5
55 7 30,5 55,8 52,8
56 8 136,8 -50,5 -53,5
57 9 30,5 55,8 52,8
58 10 136,8 -50,5 -53,5