39
|
Wed Nov 19 16:24:25 2014 |
Axel König | common | Running EUDAQ | | | | | Unknown |
Windows PC at Telescope:
0.) JTAG Programming: Chose a threshold file (recommended threshold 5) File: M26TB_Cern_2011.thresh5.mcf--> press start
1.) C:\Users\telescope\Desktop\users\BelleII --> start Mimosa 26 Telescope --> select all six Mimosa's
2.) C:\Users\telescope\Desktop\users\BelleII --> start startEudaq_fullWindows.bat
3.) Use configuration file hephy1 (location: C:\eudaq\conf). Change it according to your TLU settings (DUT mask, AND mask, etc.)
4.) configure
5.) start
x) Online monitor in preparation
Files: Are saved in C:\eudaq\data with internal numbering "run000000xxx.raw" (look at the date and time). [You can connect locally to this folder at HEPHY-SVD PC] |
38
|
Wed Nov 19 09:26:39 2014 |
Axel König | Infineon | hardware run | Infineon_run006 | 1500 | | | Unknown |
Infineon new stack - batch 4
multi hit
HV=300V, total I = 4.0200 µA
strips vertical
Table Position: H: 96mm V: 91mm
data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
-- stopped --
1500 Events only --> no trigger signals from TU (01:30 Uhr) |
37
|
Wed Nov 19 00:58:27 2014 |
Axel König | Infineon | hardware run | Infineon_run005 | 87000 | | | Unknown |
Infineon new stack - batch 4
multi hit
HV=300V, total I = 4.0200 µA
strips vertical
Table Position: H: 96mm V: 81mm
data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
--stopped 19.11 // 01:00 --
Reason: Enough events, new dut postion for next multi run
Events: 87000 |
36
|
Tue Nov 18 23:04:34 2014 |
Axel König | Infineon | hardware run | Infineon_run004 | 400000 | | | Unknown |
Infineon new stack - batch 4
single hit
HV=300V, total I = 4.0044 µA
strips vertical
Table Position: H: 96mm V: 81mm
data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
--stopped 18.11 // 23:05---
Reason: Enough events, next run with the same position but now multi six
Events: 400000
|
35
|
Tue Nov 18 20:42:18 2014 |
Benedikt Würkner | Belle SVD | Coordinates of the DUT | | | | | Unknown |
We set the coordinates trying to put the beam in an area with well working APVs
Peak of course differs for n and p sensors due to their different pitch.
L4-6 n-side Peak around strip 180
L4&6 p-side mean value around strip 380
L5 p-side moved by 4.8mm due to reasons (APV misalignment I think) therefore the peak of the same measurements is moved by 4.8/75µm = 64 strips therefore centered around strip 320
The coordinates of the x-y table were set to 0:0 at this point. Refer to Run Alignment2 for reference data. |
33
|
Tue Nov 18 20:26:12 2014 |
Hao Yin | Belle SVD | HardwareRun_001 | | | Tue Nov 18 18:21:50 CET 2014 | | Unknown |
At room temperature
Latest ADC scan and FIR run.
Latest CAL.
Position: 0.0, see elog entry. |
32
|
Tue Nov 18 18:45:01 2014 |
Hao Yin | Belle SVD | Trigger Delay scan | | | Tue Nov 18 18:21:50 CET 2014 | | Unknown |
At room temperature
First run was at: 23 (no track)
TimingRun_001:
Trigger delay: 26
TimingRun_002:
Trigger delay: 29
TimingRun_003:
Trigger delay: 32
TimingRun_004:
Trigger delay: 20
TimingRun_005:
Trigger delay: 17
TimingRun_005:
Trigger delay: 14
Trigger chip delay: 110
|
31
|
Tue Nov 18 18:33:31 2014 |
Axel König | Infineon | hardware run | Infineon_run003 | 300000 | | | Unknown |
Infineon new stack - batch 4
single hit
HV=300V, total I = 4.0044 µA
strips vertical
Table Position: H: 96mm V: 101mm
data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
--Stopped 18.11 / 20:20---
Reason: Enough events, adjusting new DUT position for next run
Events: 300000 |
30
|
Tue Nov 18 18:29:55 2014 |
Axel König | Infineon | calibration run | Infineon_run002 | | | | Unknown |
Infineon_run002 is just a calibration run for the vertical positioned sensors.
data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg |
29
|
Tue Nov 18 13:13:53 2014 |
Thomas Bergauer | Infineon | hardware run | infineon_run001 | 225508 | | | Unknown |
Infineon new stack - batch 4
single hit
HV=300V, total I = 4.2475 µA
strips horizontal
data file in L:\cern14\infineon\Infineon Run horiz
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
STOPPED by main User in H6B (18:11, 15:00)
Events: 225508
Next step: rearange modules vertically
|
28
|
Tue Nov 18 12:35:32 2014 |
Axel König | common | Infineon (4 modules) TLU Settings | | | | | Unknown |
- VNC to 192.168.0.18
- In command line: cd C:\Users\telescope\eudaq\bin
- TLUControl.exe.exe -d 2 -a 11 - i RJ45
Operating with AIDA telescope: TLUControl.exe.exe -d 3 -a 11 - i RJ45
Dut Position (left to right): 11, 06, 05, 07 |
27
|
Tue Nov 18 10:26:56 2014 |
Hao Yin | Belle SVD | CalibrationRun_003 | | | Tue Nov 18 10:26:52 CET 2014 | | Unknown |
At room temperature
Latest delay and FIRRun |
26
|
Tue Nov 18 10:12:25 2014 |
Hao Yin | Belle SVD | 6let PedestalRun_005 | | 10000 | Tue Nov 18 10:11:45 CET 2014 | | Unknown |
At room temperature
Latest delay, FIRRun002.
Check for bad strips. |
25
|
Tue Nov 18 09:51:11 2014 |
Hao Yin | | CalibrationRun_002 | | | Tue Nov 18 09:50:24 CET 2014 | | Unknown |
At room temperature
PedestalRun004
Latest delay settings and FIRRun |
24
|
Tue Nov 18 09:48:53 2014 |
Hao Yin | Belle SVD | PedestalRun_004 | | 10000 | Tue Nov 18 09:48:30 CET 2014 | | Unknown |
At room temperature.
Old delay settings and FIRRun_002
|
23
|
Tue Nov 18 09:45:59 2014 |
Hao Yin | | FIRRun_002 | 002 | | Tue Nov 18 09:45:58 CET 2014 | | Unknown |
New FIR run after reconecting to original setting. |
22
|
Tue Nov 18 01:05:04 2014 |
Hao Yin | Belle SVD | PedestalRun_003 | | | Tue Nov 18 01:03:32 CET 2014 | | Unknown |
New pedestal run after switching the connectors.
At room temperature |
21
|
Tue Nov 18 01:03:18 2014 |
Hao Yin | Belle SVD | Remapped FADC inputs | | | Tue Nov 18 01:03:32 CET 2014 | | Unknown |
We moved the second cable to the third connector on the FADC to match DESY testbeam conditions. |
20
|
Mon Nov 17 23:04:57 2014 |
Hao Yin | Belle SVD | PedestalRun_002 | | 10338 | Mon Nov 17 23:03:03 CET 2014 | | Unknown |
Pedestal run at room temperature.
6 subevents. Noise reference run.
Delay as latest run.
Reference run for bad strips. |
19
|
Mon Nov 17 22:28:09 2014 |
Hao Yin | | CalibrationRun | 001 | | Mon Nov 17 22:27:07 CET 2014 | | Unknown |
Noise file from run 001
PedestalRun_001
FIRRun_001
At room temperature
See DelayRun_001
|