At room temperature
First run was at: 23 (no track)
TimingRun_001:
Trigger delay: 26
TimingRun_002:
Trigger delay: 29
TimingRun_003:
Trigger delay: 32
TimingRun_004:
Trigger delay: 20
TimingRun_005:
Trigger delay: 17
Trigger delay: 14 Trigger chip delay: 110
* CCC (zentraler Beschleuniger-Kontrollraum): 77500
* H6A Controlroom: 76755
* HEPHY-Handy: 16-2471 or +41 76 487 2471 from outside of CERN
* Office in Meyrin: 12-R11: 74592
Hostel-Zimmern:
* Bergi: 79326
* Benni: 60232
* Hao: 70408
Andere Wichtige Leute:
* Beam-Dame: Edda Gschwendner 16-5080
* NA Hallen Verantwortlicher: Michael Jeckel
Lookup Telefonnummern: http://phonebook.cern.ch
Logbook: https://ab-dep-op-elogbook.web.cern.ch/ab-dep-op-elogbook/elogbook/secure/eLogbook.php?shiftId=1059325
Monitor: http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
Windows PC at Telescope:
0.) JTAG Programming: Chose a threshold file (recommended threshold 5) File: M26TB_Cern_2011.thresh5.mcf--> press start
1.) C:\Users\telescope\Desktop\users\BelleII --> start Mimosa 26 Telescope --> select all six Mimosa's
2.) C:\Users\telescope\Desktop\users\BelleII --> start startEudaq_fullWindows.bat
3.) Use configuration file hephy1 (location: C:\eudaq\conf). Change it according to your TLU settings (DUT mask, AND mask, etc.)
4.) configure
5.) start
x) Online monitor in preparation
Files: Are saved in C:\eudaq\data with internal numbering "run000000xxx.raw" (look at the date and time). [You can connect locally to this folder at HEPHY-SVD PC]
We moved the second cable to the third connector on the FADC to match DESY testbeam conditions.
cooled see appendix (FIRRun003)
MaxEvents 10000
cooled (temperature see attachment latest noise run),
latest Noise, FIR settings with the right layout mapping.
temp see attachment (von flo) 10000 latest fir filter (002)
Temperature: See attachment
FIRFilterRun_002
Layer 3-n side deactivated, because Hao broke it.
At room temperature.
Old delay settings and FIRRun_002
New pedestal run after switching the connectors.
Pedestal run at room temperature.
6 subevents. Noise reference run.
Delay as latest run.
Reference run for bad strips.
correct mapping
cooled -25 °C
L3n deactivated
Pedestal Run
room temperature (30C)
Bias scans planned
Initial pedestal run with SVD3 setup and WedgeOld, FW993, BW993 (reading out 4 chips on every p-side)
Der zweite PM (entsprechend der Beamrichtung) war von Anfang an nicht angeschlossen an die TLU! Stattdessen war ein Atlas pixel sensor, welcher als 4ter PM fungiert angeschlossen. Genau dieser "PM" hatte 0 counts bei der TLU --> Igor sagt, dass dieser Sensor ("PM") anscheinend keine Versorgungsspannung hatte (~400V). Jetzt baut Igor diesen Atlas Sensor wieder aus und hat bereits den nicht angeschlossenen PM wieder angeschlossen an die TLU. DIeser PM zeigt aber nun zu viele counts. Deshalb behalten wir die AND mask 11 (auch jetzt bei den Belle Modulen).
initial position of Infineon Stack (PI Micromove): (guess center position by eye)
STRIPS IN HORIZONTAL DIRECTION
* vertical axis: M511.DD: Zero position 81.0mm / higher values correspond to lowering the table
* vertical axis: M521.DD: Zero position 96.0mm / higher values correspond to move the table to the table mounting
PC (gehört AIDA) in H6b control room: ssh telescope@pcaidatb.cern.ch