Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 2 of 6  Not logged in ELOG logo
Entry  Mon Nov 17 22:21:50 2014, Hao Yin, , Bad APVs, , , Mon Nov 17 22:08:29 CET 2014, , Unknown 

List with bad APVs:


 

Crap:

 APV 5 L6-p Channel 23

 

Not working:

 L3-n APV 3

 

Entry  Mon Nov 17 22:22:56 2014, Hao Yin, , PedestalRun_001, 001, 10000, Mon Nov 17 22:22:41 CET 2014, , Unknown 

At room temperature.

 

Entry  Mon Nov 17 22:28:05 2014, Hao Yin, , CalibrationRun, 001, , Mon Nov 17 22:27:07 CET 2014, , Unknown 

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

Entry  Mon Nov 17 22:28:07 2014, Hao Yin, , CalibrationRun, 001, , Mon Nov 17 22:27:07 CET 2014, , Unknown 

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

Entry  Mon Nov 17 22:28:09 2014, Hao Yin, , CalibrationRun, 001, , Mon Nov 17 22:27:07 CET 2014, , Unknown 

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

Entry  Mon Nov 17 23:04:57 2014, Hao Yin, Belle SVD, PedestalRun_002, , 10338, Mon Nov 17 23:03:03 CET 2014, , Unknown 

Pedestal run at room temperature.

6 subevents. Noise reference run.

Delay as latest run.

 

Reference run for bad strips.

Entry  Tue Nov 18 01:03:18 2014, Hao Yin, Belle SVD, Remapped FADC inputs, , , Tue Nov 18 01:03:32 CET 2014, , Unknown 

We moved the second cable to the third connector on the FADC to match DESY testbeam conditions. 

Entry  Tue Nov 18 01:05:04 2014, Hao Yin, Belle SVD, PedestalRun_003, , , Tue Nov 18 01:03:32 CET 2014, , Unknown 

New pedestal run after switching the connectors.

At room temperature 

Entry  Tue Nov 18 09:45:59 2014, Hao Yin, , FIRRun_002, 002, , Tue Nov 18 09:45:58 CET 2014, , Unknown 

New FIR run after reconecting to original setting. 

Entry  Tue Nov 18 09:48:53 2014, Hao Yin, Belle SVD, PedestalRun_004, , 10000, Tue Nov 18 09:48:30 CET 2014, , Unknown 

At room temperature.

Old delay settings and FIRRun_002

 

Entry  Tue Nov 18 09:51:11 2014, Hao Yin, , CalibrationRun_002, , , Tue Nov 18 09:50:24 CET 2014, , Unknown 

At room temperature

PedestalRun004 

Latest delay settings and FIRRun

Entry  Tue Nov 18 10:12:25 2014, Hao Yin, Belle SVD, 6let PedestalRun_005, , 10000, Tue Nov 18 10:11:45 CET 2014, , Unknown 

At room temperature

Latest delay, FIRRun002. 

Check for bad strips.

Entry  Tue Nov 18 10:26:56 2014, Hao Yin, Belle SVD, CalibrationRun_003, , , Tue Nov 18 10:26:52 CET 2014, , Unknown 

At room temperature

Latest delay and FIRRun 

Entry  Tue Nov 18 12:35:32 2014, Axel König, common, Infineon (4 modules) TLU Settings, , , , , Unknown 
  1.  VNC to 192.168.0.18
  2. In command line: cd C:\Users\telescope\eudaq\bin
  3. TLUControl.exe.exe -d 2 -a 11 - i RJ45

Operating with AIDA telescope: TLUControl.exe.exe -d 3 -a 11 - i RJ45

Dut Position (left to right):  11, 06, 05, 07

Entry  Tue Nov 18 13:13:53 2014, Thomas Bergauer, Infineon, hardware run, infineon_run001, 225508, , , Unknown 

Infineon new stack - batch 4

single hit
 
HV=300V, total I = 4.2475 µA
 
strips horizontal
 
data file in L:\cern14\infineon\Infineon Run horiz
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
 
STOPPED by main User in H6B (18:11, 15:00)
 
Events: 225508
Next step: rearange modules vertically
 
Entry  Tue Nov 18 18:29:55 2014, Axel König, Infineon, calibration run, Infineon_run002, , , , Unknown 

Infineon_run002 is just a calibration run for the vertical positioned sensors. 

data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
Entry  Tue Nov 18 18:33:31 2014, Axel König, Infineon, hardware run, Infineon_run003, 300000, , , Unknown 

Infineon new stack - batch 4

single hit

HV=300V, total I = 4.0044 µA

strips vertical

Table Position: H: 96mm V: 101mm

data file in L:\cern14\infineon\Infineon Run vert

config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg

 

--Stopped 18.11 / 20:20---

Reason: Enough events, adjusting new DUT position for next run

Events: 300000

Entry  Tue Nov 18 18:45:01 2014, Hao Yin, Belle SVD, Trigger Delay scan, , , Tue Nov 18 18:21:50 CET 2014, , Unknown 

At room temperature

First run was at: 23 (no track)

 

TimingRun_001:

Trigger delay: 26

 

TimingRun_002:

Trigger delay: 29

 

TimingRun_003:

Trigger delay: 32


 

TimingRun_004:

Trigger delay: 20

 
 

TimingRun_005:

Trigger delay: 17

 

TimingRun_005:

Trigger delay: 14
Trigger chip delay: 110

 

 

 

Entry  Tue Nov 18 20:26:12 2014, Hao Yin, Belle SVD, HardwareRun_001, , , Tue Nov 18 18:21:50 CET 2014, , Unknown 

At room temperature

Latest ADC scan and FIR run.

Latest CAL.

 

Position: 0.0, see elog entry.

Entry  Tue Nov 18 20:42:18 2014, Benedikt Würkner, Belle SVD, Coordinates of the DUT, , , , , Unknown 

We set the coordinates trying to put the beam in an area with well working APVs

Peak of course differs for n and p sensors due to their different pitch.

L4-6 n-side Peak around strip 180

L4&6 p-side mean value around strip 380

L5 p-side moved by 4.8mm due to reasons (APV misalignment I think) therefore the peak of the same measurements is moved by 4.8/75µm = 64 strips therefore centered around strip 320

The coordinates of the x-y table were set to 0:0 at this point. Refer to Run Alignment2 for reference data.

ELOG V3.1.5-fc6679b