ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Data |
Text |
|
7
|
Sat Oct 13 06:55:47 2012 |
Manfred Valentan | MicronBaby | run | run002 | 234019 | 13.10.2012 06:50:00 | 13.10.2012 13:50:40 | Unknown | Micron baby stack
HV = -100V I=5.4uA
beam on |
|
4
|
Fri Oct 12 23:10:14 2012 |
Christian Irmler | MicronBaby | run | run001 | 333000 | 12.10.2012 23:05:19 | 13.10.2012 06:29:00 | Good | Micron baby stack
HV = -100V I=5.8uA
beam on |
|
3
|
Fri Oct 12 22:00:52 2012 |
Christian Irmler | MicronBaby | cal | cal001 | 83800 | 12.10.2012 21:16:33 | 12.10.2012 21:59:02 | Good | 12.10.2012 21:16:33 event=0
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB |
|
1
|
Fri Oct 12 15:04:55 2012 |
Marko Dragicevic | common | Network configuration | | | | | Unknown | Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch |
|
2
|
Fri Oct 12 19:42:36 2012 |
Christian Irmler | MicronBaby | Configuration of normal stack | | | | | Unknown | Micron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not |
|
5
|
Fri Oct 12 23:51:35 2012 |
Markus Friedl | common | Zimmernummer & Telefonnummern | | | | | Unknown | 2nd week:
Markus: 38 - 420 (phone: 70
420) |
|
6
|
Fri Oct 12 23:52:57 2012 |
Markus Friedl | common | Sozialisierung | | | | | Unknown | Prost, Bergi!
(Das ist nur ein Test, ob du wirklich
all die Elog-Emails liest.) |
|
8
|
Sat Oct 13 14:44:47 2012 |
Manfred Valentan | MicronOrigami_gross | Stack configuration, Belle Stack 3 | | | | | Unknown | Module in Beamrichtung:
2-DSSD Origami -z
2-DSSD Origami ce |
|
9
|
Sat Oct 13 19:04:02 2012 |
Manfred Valentan | MicronOrigami_gross | run with Belle stack 3 | run003 | 30k | 13.10.2012 19:02:31 | | Unknown | Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V |
|
10
|
Sat Oct 13 19:04:23 2012 |
Markus Friedl | MicronOrigami_gross | CO2 cooling | | | | | Unknown | Wir haben ja schon seit langem vermutet,
dass man mit reiner Gasphase nicht kühlen
kann. Jetzt erbringen wir den experimentellen |
|
13
|
Sun Oct 14 02:00:12 2012 |
Manfred Valentan | MicronBaby | Configuration of intermediate stack | | | | | Unknown | Micron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not |
|
16
|
Sun Oct 14 09:08:42 2012 |
Manfred Valentan | MicronBaby | run | run006 | 300k | 14.10.2012 09:01:15 | | Unknown | Micron baby intermediate stack
HV = -100V I=6.9uA
beam on |
|
20
|
Mon Oct 15 18:52:18 2012 |
Marko Dragicevic | MicronOrigami_gross | Stack configuration, Belle Stack 2 | | | | | Unknown | Belle stack 2:
Modules:
Origami #4
Origami |
|
21
|
Mon Oct 15 19:21:56 2012 |
Marko Dragicevic | common | Beam settings and profile | | | | | Unknown | Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad)
PARALL IN H6A; RD42 |
|
30
|
Tue Oct 16 23:03:09 2012 |
Markus Friedl | common | Sozialisierung | | | | | Unknown | So steuert man einen Testbeam!
|
|
34
|
Wed Oct 17 14:06:24 2012 |
Markus Friedl | MicronOrigami_gross | Stack für stealth parasitic mode | | | | | Good | Dieser Stack wird jetzt quasi als Pausenkasperl
eingebaut und läuft im "stealth
parasitic" mode während der Irradiation-Woche. |
|
36
|
Thu Oct 18 09:14:07 2012 |
Manfred Valentan | common | Fahrt nach Mol | | | | | Unknown | Liebe Kollegen,
wir brechen. auf. Wünscht uns
Glück! |
|
59
|
Wed Oct 24 17:24:40 2012 |
Thomas Bergauer | MicronOrigami_gross | run ohne Strom ;-( | run028 | | | | Unknown |
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2 |
|
79
|
Tue Oct 30 22:15:41 2012 |
Markus Friedl | MicronOrigami_gross | run | run041 | 100k | 30.10.2012 22:09:13 | | Unknown | Cooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling |
|
80
|
Wed Oct 31 15:54:59 2012 |
Christian Irmler | common | Ethernetkabel zu H6A | | | | | Unknown | Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt
im Zwischenboden unterhalb der orangenen |
|