Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 3 of 4  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime Data Text Attachments
  52   Tue Oct 23 08:22:42 2012 Markus FriedlMicronOrigami_grossrunrun02510000023.10.2012 08:21:3723.10.2012 13:47:09GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=47uA
  
  53   Tue Oct 23 13:50:44 2012 Markus FriedlMicronOrigami_grosscalcal0258380023.10.2012 13:47:09 23.10.2012 14:35:05GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=48uA
  
  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  55   Tue Oct 23 16:06:09 2012 Markus FriedlMicronOrigami_grossrunrun02610212423.10.2012 16:04:4723.10.2012 23:04:56UnknownBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position:
  
  59   Wed Oct 24 17:24:40 2012 Thomas BergauerMicronOrigami_grossrun ohne Strom ;-(run028   Unknown 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  63   Sat Oct 27 19:36:24 2012 Markus FriedlMicronOrigami_grosscalcal0318380027.10.2012 19:59:5027.10.2012 20:44:38GoodBelle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
  
  64   Sat Oct 27 21:49:08 2012 Markus FriedlMicronOrigami_grossrunrun031150k27.10.2012 21:42:4628.10.2012 02:35:55 (+1h due to winter time)GoodBelle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
  
  65   Sun Oct 28 02:51:49 2012 Markus FriedlMicronOrigami_grossrunrun032150k28.10.2012 02:47:2428.10.2012 08:31:19 GoodBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
  
  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 UnknownBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
 temp_run33.JPGtemp_run33_2.JPG 
  77   Tue Oct 30 17:24:01 2012 Markus FriedlMicronOrigami_grosscalcal0408380030.10.2012 17:20:28 30.10.2012 17:54:09UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
  
  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    UnknownMicron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not
 micronbaby_stack_geometry.jpg 
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  4   Fri Oct 12 23:10:14 2012 Christian IrmlerMicronBabyrunrun00133300012.10.2012 23:05:1913.10.2012 06:29:00GoodMicron baby stack
HV = -100V   I=5.8uA
beam on
  
  7   Sat Oct 13 06:55:47 2012 Manfred ValentanMicronBabyrunrun00223401913.10.2012 06:50:0013.10.2012 13:50:40UnknownMicron baby stack
HV = -100V   I=5.4uA
beam on
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  
ELOG V3.1.5-fc6679b