Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 1 of 5  Not logged in ELOG logo
Entry  Fri Sep 16 11:01:15 2011, Manfred Valentan, Micron, Micron Baby Modules, , , , ,  

Irradiated modules from last year:

COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3)
(the irradiated atoll p-stop sensor was destroyed for electron microscopy and SRP)

Unirradiated modules from last year:

COMB-1: B2Micron_2826_01_Baby4: combined p-stop, intermediate strips (was TRK6)
COMM-1: B2Micron_2826_19_Baby2: common p-stop, intermediate strips (was TRK7)
ATOLL-1: B2Micron_2826_07_Baby3: atoll p-stop, intermediate strips (was prepared, but not used in the beam test)

New modules:

SPRAY-I-1: B2Micron_2825_15_Baby2: p-spray, intermediate strips
SPRAY-I-2: B2Micron_2825_15_Baby3: p-spray, intermediate strips
SPRAY-1: B2Micron_2825_05_Baby3: p-spray, no intermediate strips
SPRAY-2: B2Micron_2825_05_Baby4: p-spray, no intermediate strips
COMB-2: B2Micron_2826_17_Baby4: combined p-stop, intermediate strips
COMM-2: B2Micron_2826_17_Baby2: common p-stop, intermediate strips
ATOLL-2: B2Micron_2826_17_Baby3: atoll p-stop, intermediate strips

 

Entry  Mon Sep 19 17:38:34 2011, Manfred Valentan, Micron, Module ATOLL-2, , , , ,  

Sensor: B2Micron_2826_17_Baby3

p-stop: Atoll, with intermediate strips

Hybrid p-side: H35 (reused from last year)
Hybrid n-side: MB3

Entry  Mon Sep 19 17:39:09 2011, Manfred Valentan, Micron, Module COMM-2, , , , ,  

Sensor: B2Micron_2826_17_Baby2

p-stop: Common, with intermediate strips

Hybrid p-side: H34 (reused from last year)
Hybrid n-side: MB4

Entry  Mon Sep 19 17:39:55 2011, Manfred Valentan, Micron, Module COMB-2, , , , ,  

Sensor: B2Micron_2826_17_Baby4

p-stop: Combined with intermediate strips

Hybrid p-side: H42 (reused from last year)
Hybrid n-side: MB3

Entry  Mon Sep 19 17:40:47 2011, Manfred Valentan, Micron, Module SPRAY-2, , , , ,  

Sensor: B2Micron_2825_05_Baby4

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H44 (reused from last year)
Hybrid n-side: MB6

Entry  Mon Sep 19 17:41:27 2011, Manfred Valentan, Micron, Module SPRAY-I-2, , , , ,  

Sensor: B2Micron_2825_15_Baby3

p-stop: p-spray WITH intermediate strips

Hybrid p-side: H43 (reused from last year)
Hybrid n-side: MB7

Entry  Mon Sep 19 17:42:01 2011, Manfred Valentan, Micron, Module SPRAY-1, , , , ,  

Sensor: B2Micron_2825_05_Baby3

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H32 (reused from last year)
Hybrid n-side: MB8

Entry  Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,  

Sensor: B2Micron_2825_15_Baby2

p-stop: p-spray WITH intermediate strips

Hybrid p-side: MB1
Hybrid n-side: MB9

Entry  Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,  

Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)

p-stop: Common, with intermediate strips

Hybrid p-side: H46
Hybrid n-side: M37

Entry  Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,  

Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)

p-stop: Combined, with intermediate strips

Hybrid p-side: H45
Hybrid n-side: M36

Entry  Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,  

Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010)

p-stop: Atoll, with intermediate strips

Hybrid p-side: H40
Hybrid n-side: M30

Entry  Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,  

Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)

p-stop: Combined, with intermediate strips, irradiated

Hybrid p-side: H48
Hybrid n-side: M35

Entry  Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,  

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

Entry  Mon Oct 3 20:30:14 2011, Thomas Bergauer, common, XY Tisch, , , , ,  xy-tisch-control.JPGdesy_xy_table.jpg

Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)

Raten-Scan siehe gescannter Zettel im Attachment.

 

erster Wert: X, also horizontal (positive Zahlen: Saleve side = Restaurant Nr. 3)

zweiter Wert: Z, also Höhe (positive Zahlen nach unten)

Micron DUT: X:324, Z:103 [Einheiten in mm]

 

configuration: IP-Address 192.168.0.13; 2 Achsen

Entry  Mon Oct 3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,  Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg

Photo of hand-drawn stack configuration, config files

Entry  Wed Oct 5 19:33:40 2011, Markus Friedl, common, Trigger condition, , , 4.10.2011 15:00, ,  trigger_path_with_veto.png

Changed trigger such that off-spill scintillator triggers are vetoed.

Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator trigger.

This also changes the timing, which was unfortunately not detected until 30 hours later. Thus, runs 4-7 have bad (wrong) timing -> UNUSABLE

Entry  Fri Oct 7 18:28:53 2011, Christian Irmler, common, run schedule, , , , , Unknown run_schedule.pdfrun_schedule.xlsx
 
Entry  Sat Oct 8 09:30:44 2011, Christian Irmler, BELLE, Cooling plant tests, , , 08.10.2011 09:30, , Unknown biascurrent_cooling_test1.jpgtemp_cooling_test1.jpg

Software run with 6 samples to ensure that APV chips dissipate full power.

DAQ data not saved, bias current monitored

new longterm files:
It-neg-0810110926.txt
It-pos-0810110926.txt

Entry  Sat Oct 8 16:35:04 2011, Thomas Bergauer, HPK, baby_std, run017, , 08.10.2011 16:26:10, , Crap 

wrong timing

 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=7.6uA;  Istart_N=0.42
std. I2C settings

Entry  Sun Oct 9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown IMG_5058.JPGIMG_5069.JPG

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

ELOG V3.1.5-fc6679b