Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 2 of 5  Not logged in ELOG logo
Entry  Sun Oct 9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown IMG_5097.JPG

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Entry  Mon Oct 10 12:16:06 2011, Marko Dragicevic, common, Beam Profile and Magnet BeamRef Settings , , , , , Unknown BeamProfile.pngMagentBeamRefs.png

Beam Profile from H6A, 10.10.2011 11:40

BeamRef settings for all magnets, File H6B.702

Entry  Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown IMG_5102.JPGIMG_5092.JPG

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Entry  Thu Oct 13 13:08:38 2011, Thomas Bergauer, common, end of success, , , , , Unknown 
 
Entry  Thu Oct 20 11:49:14 2011, Markus Friedl, common, Scintillator dimensions, , , , , Good bhihagag.jpgbdgaegba.jpg
 
Entry  Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012 13:35:08, 22.02.2012 13:54:08 , Crap 

Sr90, large scintillator,
HVret @ Origami closed
HVret @ SMU connected
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

Wires between HV connectors ground and HVret conntact at the mambo were open --> no HVret conntection between module and SMUs!
Moreover the SMU Inv. Nr. 545-078 has either an unstable output or problems with the current measurement.

Entry  Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012 16:22:34, 22.02.2012 16:41:26, Good run104.jpgrun104_current.xls

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

APV 0 1 2 3 4 5 6 7
avg noise 2.564 2.124 2.094 2.200 1.696 1.666 1.870 1.888
CM noise 1.7 0.9 0.9 1.3 4.0 4.1 4.1 4.2

 

 

Entry  Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012 17:39:10 , 22.02.2012 17:58:01, Good run105.jpg

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as run104, but now J7 open

Again spikes in bias current!

 

Entry  Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

Entry  Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown 

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Wed Mar 7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012 15:13:18, 07.03.2012 14:31:07, Unknown 

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

Entry  Wed Mar 7 16:03:30 2012, Christian Irmler, BELLE, Origami Module #4, run113, 100k, 07.03.2012 16:07:34, 07.03.2012 16:30:48 , Unknown run112-113.jpg

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

Entry  Wed Mar 7 16:58:36 2012, Christian Irmler, BELLE, Origami Module #4, cal113, 100k, 07.03.2012 16:40:04 , 07.03.2012 16:57:08, Unknown 

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

Entry  Wed Oct 5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011 20:25:10, 05.10.2011 20:45:10, Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on
I=20.5µA; new I2C settings; corrected trigger delay (htr)

New run with cold Origami and new I2C settings (shorter peaking time) and hopefully correct timing.

corresponding cal file: cal007

Entry  Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good 

no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

Entry  Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011 14:09:00, 10.10.2011 16:11:57, Good 

no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Istart_CNM= 31 / 1.4 uA;  Istart_BSTD= 0.2 uA

Entry  Sat Oct 8 16:45:14 2011, Thomas Bergauer, HPK, baby_std, run018, 150000, 08.10.2011 16:44:13, 08.10.2011 19:33:33, Good 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings, now with correct timing

Entry  Sat Oct 8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011 20:22:45, 08.10.2011 23:19:23, Good 

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

Entry  Sun Oct 9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011 10:56:47, 09.10.2011 12:47:23, Good 

no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings

ELOG V3.1.5-fc6679b