Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 6 of 8  Not logged in ELOG logo
Entry  Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37 cnm_2d_2.pngcnm_2d_1.png
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Thu Sep 30 18:12:53 2010, Markus Friedl, Micron Baby, run, run017, 35000, 30.09.2010 18:11:53, 30.09.2010 20:22:43 number_of_clusters_telescope.png
micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
Entry  Tue Oct 5 10:20:30 2010, Manfred Valentan, BELLE, run, run46, 350000, 05.10.2010 01:00:00, 05.10.2010 10:16:07 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Tue Sep 28 15:09:16 2010, Markus Friedl, BELLE, run, run005, 40000, 28.09.2010 15:07:08, 28.09.2010 20:20:12 
previous run stopped due to beam problem (shifted, broad, etc).
now recovered, restarting with same settings.
 
Entry  Wed Oct 6 11:51:25 2010, Thomas Bergauer, Micron Baby, run, run049, 4489, 06.10.2010 11:38:21, 06.10.2010 11:49:23 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on 
not yet optimized XY-table positions (111/43.5/7.5)
Entry  Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44 LongtermITERun2.png
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51 
2 x SILC + 2 x ITE
HV=100V
 
Entry  Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44 run021_sensordisplay1.jpghit_map_und_cluster.png
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
Entry  Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27 
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!
Entry  Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51 
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Tue Sep 28 01:13:57 2010, Markus Friedl, BELLE, cal, cal001, 83800, 28.09.2010 01:11:20,  
first intcal with complete Belle stack: 2 x Origami, 2 x Micron
HV=100V  I=49uA
beam is on
Entry  Tue Sep 28 22:07:16 2010, Markus Friedl, BELLE, cal, cal002 DO NOT USE -> go to cal003, 83800, 28.09.2010 22:01:55,  
Belle stack (Origami, Micron, Micron, Origami)
now cooling only for Origami, Micron are uncooled
chiller set point: -25°C, measured values on Origami: -10°C
Entry  Wed Sep 29 09:39:33 2010, Markus Friedl, BELLE, cal, cal003, 83800, 29.09.2010 09:38:00,  
same as cal002, but now with corrected readout order
Entry  Wed Sep 29 14:03:55 2010, Markus Friedl, BELLE, cal, cal004, 83800, 29.09.2010 14:02:25, 29.09.2010 14:45:05 
Belle stack: Origami-Micron-Micron-Origami 
HV=100V, Ibias=100µA, beam off
no cooling
Entry  Wed Sep 29 17:38:19 2010, Markus Friedl, Micron Baby, cal, cal005, 83800, 29.09.2010 17:36:38,  
micron baby stack
HV=100V I=6.5uA
Beam off
Entry  Thu Sep 30 15:06:28 2010, Markus Friedl, Micron Baby, cal, cal006, 83800, 30.09.2010 15:01:56,  
micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
ELOG V3.1.5-fc6679b