ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
79
|
Mon Oct 4 16:15:48 2010 |
Christian Irmler | Pt | run | run042 | 25600 | 04.10.2010 16:12:52 | 04.10.2010 16:35:18 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
77
|
Mon Oct 4 14:15:22 2010 |
Manfred Valentan | Pt | run | run040 --> unusable --> no bias | 25600 | 04.10.2010 14:?:? | 04.10.2010 14:32:14 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 47 deg
telescope run 20146
bias voltage has been ramped down during run039 --> needs to be repeated. |
75
|
Mon Oct 4 12:24:38 2010 |
Erik Huemer | Pt | run | run038 | 25600 | 04.10.2010 12:22:09 | 04.10.2010 12:43:40 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
HV=200V beam on
angle: 43 deg
telescope run 20144 |
74
|
Mon Oct 4 11:43:05 2010 |
Christian Irmler | Pt | run | run037 | 25600 | 04.10.2010 11:40:15 | 04.10.2010 12:15:03 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
73
|
Mon Oct 4 10:43:45 2010 |
Marko Dragicevic | Pt | run | run036 | 25600 | 04.10.2010 10:33:05 | 04.10.2010 11:35:51 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg
telescope run 20142 |
69
|
Sun Oct 3 21:49:19 2010 |
Erik Huemer | Pt | run | run032 | 25600 | 03.10.2010 21:44:30 | 03.10.2010 22.40.07 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 31
telescope run 20136 |
63
|
Sun Oct 3 08:19:13 2010 |
Markus Friedl | ITE | run | run029 | 75000 | 03.10.2010 08:33:28 | 03.10.2010 10:50:27 |
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
61
|
Sat Oct 2 18:36:57 2010 |
Markus Friedl | ITE | run | run028 | 162263 | 02.10.2010 18:34:06 | 03.10.2010 08:11:13 |
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)
telescope run 20126 |
60
|
Sat Oct 2 17:35:51 2010 |
Markus Friedl | ITE | run | run027 | 2999 | 02.10.2010 17:34:51 | 02.10.2010 17:38:39 |
2 x SILC + 2 x ITE
HV=100V
telescope position: 107
telescope run 20125
beam not found yet |
58
|
Sat Oct 2 17:24:12 2010 |
Markus Friedl | ITE | run | run026 | 5834 | 02.10.2010 17:23:46 | 02.10.2010 17:31:51 |
2 x SILC + 2 x ITE
HV=100V
trying to find beam
telescope run 20124 |
55
|
Sat Oct 2 09:57:20 2010 |
Thomas Bergauer | CNM | run | run025 | 150k | 02.10.2010 09:54:28 | 02.10.2010 14:21:20 |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
new position along the CNM strips (XY-table to 143/76/187.5)
telescope run 20122
|
Attachment 1: run20122.png
|
|
Attachment 2: slowcontrol_cnm.png
|
|
Attachment 3: cnm_2d_1.png
|
|
Attachment 4: cnm_2d_2.png
|
|
54
|
Fri Oct 1 23:55:12 2010 |
Thomas Bergauer | CNM | run | run024 | 320k | 01.10.2010 23:53:12 | 02.10.2010 09:47:37 |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
optimized alignment (XY-table to 133/76/187.5)
telescope run 20120 |
Attachment 1: cnm_2d_2.png
|
|
Attachment 2: cnm_2d_1.png
|
|
48
|
Thu Sep 30 23:09:29 2010 |
Thomas Bergauer | Micron Baby | run | run019 | 162000 | 30.09.2010 23:08:03 | 01.10.2010 9:33:38 |
micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation
telescope run 20115 (after JTAG programming of telescope chips due to config errors)
|
Attachment 1: run019_sensordisplay1.jpg
|
|
Attachment 2: Eudet-X_Cluster_Corr-run020115.jpg
|
|
Attachment 3: Eudet-Num_Clusters-run020115.jpg
|
|
50
|
Fri Oct 1 09:42:02 2010 |
Erik Huemer | Micron Baby | run | run020 | 1843 | 01.10.2010 09:59:09 | 01.10.2010 10.05 |
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation
Teleskop nicht neu gestartet, machma nochamal |
53
|
Fri Oct 1 23:50:28 2010 |
Thomas Bergauer | CNM | run | run023 | 2275 | 01.10.2010 23:49:29 | 01.10.2010 23:53:12 |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
too much optimized alignment (XY-table to 133/74/187.5) ;-)
telescope run 20119 |
52
|
Fri Oct 1 23:18:34 2010 |
Markus Friedl | CNM | run | run022 | 8139 | 01.10.2010 23:17:02 | 01.10.2010 23:45:51 |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
not optimized alignment
telescope run 20118 |
51
|
Fri Oct 1 10:06:59 2010 |
Manfred Valentan | Micron Baby | run | run021 | 75000 | 01.10.2010 10:07:37 | 01.10.2010 15:24:44 |
micron baby: 4 DUTs
HV=100V I=10.9uA (beginning) 13.6uA (end of run)
Beam on
60° rotation
telescope run 20116 |
Attachment 1: run021_sensordisplay1.jpg
|
|
Attachment 2: hit_map_und_cluster.png
|
|
1
|
Wed Sep 15 10:25:13 2010 |
Marko Dragicevic | common | Equipment List | | | | |
Slow Control:
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
-- Inv.Nr.: 540-730, 1000EUR
-- Inv.Nr.: 540-709, 1000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 1000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
-- GW Instek GPS-3030D SN.: E871711
-- HAMEG MHP4030 SN.: 057910044 500EUR
Oszilloskop Tektronix TDS 3054, SN.: B011109, 2500EUR
-- 3 probes
Die Katze (Belle-HV-Supply)
-- 2x HV-Kabel 30m (rot/schwarz)
GBIP
USB Adapter NI GPIB-USB-HS, S/N 14693EB, 100EUR
-Kabel, 3x lang, 1x kurz
USB Temperaturlogger PicoTech TC-08, S/N.: VSR 08/519 100EUR
BELLE DAQ (CERN):
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 2000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 1, Neco, 2x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
Magic Box
APVDAQ (Mol):
PC Inv.Nr: 401-943
-- Ilyama E2407, S/N 1105702000889
-- Keyboard & Maus
VME Crate Inv.Nr: 545-030
-- Create Controller Inv.Nr: 540-732
-- 3x APVDAQ
Repeater Board
-- 3x auf Platte montiert
Kabel
-- VME-Kabel (bockig)
-- 4x Netzwerk (gelb 1:1 verschalten)
-- 4x Netzwerk (grau 1:1 verschalten)
-- 1x Flachband
-- diverse Bananen
DUT:
Schraubenbox bau
-- diverse Schrauben
-- Gewindestangen
-- Fluegelmittern
-- 2x Sockel
4mm Steckschlauch fuer Trockenluft
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 3000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- Frostschutz
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Schwarze Selbstklebefolie
Alufolie
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
Module
-- 2 x Micron Trapezoid
-- 2 x 6" Origami
-- 9 x Micron Baby
-- 2 x CNM 2D Sensoren
-- 8x SiLC (No. 0-7)
-- 2x Pt
EDV:
Netzwerk-Switch:
-- D-Link 8-Port GBit-Switch DGS1008D S/N F37v89B010104, 40 EUR
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCAJ1469094, 40 EUR
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
(-- Apple MacBook Pro (MD) Inv Nr.: 401-831)
2x USB-Seriell Adapter
Netzwerkkabel
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD/DVD Rohlinge
Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Gaffa
Doppelscotch
Kabelbinder
Druckluft zur Reinigung
Adapter f. Steckdosen
Verteiler-Leisten
Kabeltrommel
Schaltbare Steckerleisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre
Wasserwaage
Misc:
Fondueset
Spiegelreflex Digitalkamera
-- Stativ
-- Reflexionszelt
Scheinwerfer
-- 3 x 500 W
-- 2 x Stativ
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA |
3
|
Thu Sep 23 15:32:28 2010 |
Manfred Valentan | Micron Baby | Modul B2Micron_2826_7_Baby4 -> UNBRAUCHBAR | | | | |
p-side: Hybrid 42
APV2: viele gerissene bonds der inneren Bondreihe
APV3: gerissene bonds innen
n-side: Hybrid 32
APV4: 0-35 fail
APV5: 10-40, 68 fail
|
Attachment 1: hardrun_2826_7_type4_pednoise_apv0.png
|
|
Attachment 2: hardrun_2826_7_type4_pednoise_apv1.png
|
|
Attachment 3: hardrun_2826_7_type4_pednoise_apv2.png
|
|
Attachment 4: hardrun_2826_7_type4_pednoise_apv3.png
|
|
Attachment 5: hardrun_2826_7_type4_pednoise_apv4.png
|
|
Attachment 6: hardrun_2826_7_type4_pednoise_apv5.png
|
|
4
|
Thu Sep 23 15:37:54 2010 |
Manfred Valentan | Micron Baby | Modul B2Micron_2826_19_Baby4 -> TRACKING & best DUT candidate | | | | |
p-side: Hybrid 48
alles ok
n-side: Hybrid 35 (wurde repariert, nachdem ein paar bonds dran glauben mussten...)
APV4: 15-25 hoher noise, keine Fehler zu sehen -> Sensorfehler?
APV5: 127&128 kreuzen sich, beim Behebungsversuch mehr Schaden angerichtet -> besser mal die Finger davon lassen! |
Attachment 1: hardrun_2826_19_type4_pednoise_apv0.png
|
|
Attachment 2: hardrun_2826_19_type4_pednoise_apv1.png
|
|
Attachment 3: hardrun_2826_19_type4_pednoise_apv2.png
|
|
Attachment 4: hardrun_2826_19_type4_pednoise_apv3.png
|
|
Attachment 5: hardrun_2826_19_type4_pednoise_apv4.png
|
|
Attachment 6: hardrun_2826_19_type4_pednoise_apv5.png
|
|