Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 5 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Numberup Events StartTime EndTime
  31   Wed Sep 29 10:30:59 2010 Markus FriedlBELLErunrun0093000029.09.2010 10:27:2729.09.2010 11:06:35

zero suppressed (HIT4) @ FADC

Belle stack: Origami-Micron-Micron-Origami - HIT4
HV=100V, Ibias=28A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered in both axes

telescope run 20084

  32   Wed Sep 29 11:09:10 2010 Markus FriedlBELLErunrun0103000029.09.2010 11:08:0329.09.2010 11:50:07

zero suppressed (HIT5) @ FADC

Belle stack: Origami-Micron-Micron-Origami - HIT5
HV=100V, Ibias=28A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered in both axes

telescope run 20085

  33   Wed Sep 29 11:53:16 2010 Erik HuemerBELLErunrun0111900329.09.2010 12:19:5729.09.2010 14:00:57

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam on
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

telescope run 20085 (continued)

  39   Wed Sep 29 19:01:28 2010 Markus FriedlMicron Babyrunrun012224829.09.2010 18:59:0929.09.2010 19:07:02

micron baby stack
HV=100V I=11.0uA
Beam on
telescope position: 121/55/7.5

 

telescope run 20105

  40   Wed Sep 29 19:08:56 2010 Markus FriedlMicron Babyrunrun0138985329.09.2010 19:09:5730.09.2010 00:52:39

micron baby stack
HV=100V I=11.0uA
Beam on
telescope position: 121/53.5/7.5   (shifted in height by -1.5mm wrt run012 for better DUT centering)

 

telescope run 20107

Attachment 1: run013_hit.png
run013_hit.png
  41   Thu Sep 30 00:56:32 2010 Markus FriedlMicron Babyrunrun014100k30.09.2010 00:55:3030.09.2010 11:20:02

micron baby stack

 

HV=100V I=11.0uA

I_end = 16uA

 

Beam on

 

telescope position: 105/40.5/7.5 

telescope run 20108

  43   Thu Sep 30 14:45:16 2010 Thomas BergauerMicron Babyrunrun01522.5k30.09.2010 13:18:1130.09.2010 14:38:01

micron baby stack angle scan 15 grad mit 3 modulen

HV=100V, I=3.8uA

Beam on

 

telescope position: 129/76/187.5

telescope run 20109

  45   Thu Sep 30 15:39:53 2010 Markus FriedlMicron Babyrunrun01631k30.09.2010 15:38:2630.09.2010 17:44:36

micron baby: 4 DUTs
HV=100V I=10.3uA (start of run);  I=16.2uA (end of run)
Beam on

 reference run @ 0°

telescope run 20110

Attachment 1: eventdisplay_schoen.png
eventdisplay_schoen.png
Attachment 2: event_display_nichsoschoen.png
event_display_nichsoschoen.png
  46   Thu Sep 30 18:12:53 2010 Markus FriedlMicron Babyrunrun0173500030.09.2010 18:11:5330.09.2010 20:22:43

micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
15° rotation

telescope run 20111

Attachment 1: number_of_clusters_telescope.png
number_of_clusters_telescope.png
  47   Thu Sep 30 20:47:01 2010 Markus FriedlMicron Babyrunrun0182693830.09.2010 20:45:4830.09.2010 22:25:25

micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
30° rotation

 

telescope run  20112

  48   Thu Sep 30 23:09:29 2010 Thomas BergauerMicron Babyrunrun01916200030.09.2010 23:08:0301.10.2010 9:33:38

micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation

 

telescope run  20115 (after JTAG programming of telescope chips due to config errors)


Attachment 1: run019_sensordisplay1.jpg
run019_sensordisplay1.jpg
Attachment 2: Eudet-X_Cluster_Corr-run020115.jpg
Eudet-X_Cluster_Corr-run020115.jpg
Attachment 3: Eudet-Num_Clusters-run020115.jpg
Eudet-Num_Clusters-run020115.jpg
  50   Fri Oct 1 09:42:02 2010 Erik HuemerMicron Babyrunrun020184301.10.2010 09:59:09 01.10.2010 10.05

micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation

Teleskop nicht neu gestartet, machma nochamal

  51   Fri Oct 1 10:06:59 2010 Manfred ValentanMicron Babyrunrun0217500001.10.2010 10:07:3701.10.2010 15:24:44

micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
60° rotation

 telescope run  20116

Attachment 1: run021_sensordisplay1.jpg
run021_sensordisplay1.jpg
Attachment 2: hit_map_und_cluster.png
hit_map_und_cluster.png
  52   Fri Oct 1 23:18:34 2010 Markus FriedlCNMrunrun022813901.10.2010 23:17:02 01.10.2010 23:45:51

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

not optimized alignment 

telescope run 20118

  53   Fri Oct 1 23:50:28 2010 Thomas BergauerCNMrunrun023227501.10.2010 23:49:2901.10.2010 23:53:12

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

Attachment 1: cnm_2d_2.png
cnm_2d_2.png
Attachment 2: cnm_2d_1.png
cnm_2d_1.png
  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

Attachment 1: run20122.png
run20122.png
Attachment 2: slowcontrol_cnm.png
slowcontrol_cnm.png
Attachment 3: cnm_2d_1.png
cnm_2d_1.png
Attachment 4: cnm_2d_2.png
cnm_2d_2.png
  58   Sat Oct 2 17:24:12 2010 Markus FriedlITErunrun026583402.10.2010 17:23:46 02.10.2010 17:31:51

2 x SILC + 2 x ITE
HV=100V

 

trying to find beam
 

telescope run 20124

  60   Sat Oct 2 17:35:51 2010 Markus FriedlITErunrun027299902.10.2010 17:34:51 02.10.2010 17:38:39

2 x SILC + 2 x ITE
HV=100V
telescope position: 107

telescope run 20125

 

beam not found yet

  61   Sat Oct 2 18:36:57 2010 Markus FriedlITErunrun02816226302.10.2010 18:34:0603.10.2010 08:11:13

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

 short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)

telescope run 20126

ELOG V3.1.5-fc6679b