Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Project Subject Run Number Events StartTime EndTime Text Attachments
  89   Wed Oct 6 10:15:26 2010 Marko DragicevicMicron BabyXY Positions After Irradiation    center position: 119/50/(7.5)
top left (direction jura, bottom
right on sensor): 127/56.5/7.5
  
  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:446 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
 LongtermITERun2.png 
  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48 6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
  
  86   Tue Oct 5 10:23:09 2010 Manfred ValentanBELLErunrun473000005.10.2010 10:21:2005.10.2010 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  83   Mon Oct 4 23:12:16 2010 Manfred ValentanBELLErunrun443000004.10.2010 23:?:?04.10.2010 23.57.23angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 angle scan Origami 1 and  Micron wedge
1
HV = 100V
  
  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    beam settings optimized by beamline operator
wire champer display fixed
 beamprofile_run042.gifbeamsettings_run042.jpg 
  79   Mon Oct 4 16:15:48 2010 Christian IrmlerPtrunrun0422560004.10.2010 16:12:5204.10.2010 16:35:18Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
  
  78   Mon Oct 4 15:39:34 2010 Christian IrmlerPtrunrun0412560004.10.2010 15:46:22 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  77   Mon Oct 4 14:15:22 2010 Manfred ValentanPtrunrun040 --> unusable --> no bias2560004.10.2010 14:?:?04.10.2010 14:32:14Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  76   Mon Oct 4 12:50:13 2010 Erik HuemerPtrunrun039 --> run out of air --> repeat2560004.10.2010 12:45:1704.10.2010 14:00:00Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
  
  75   Mon Oct 4 12:24:38 2010 Erik HuemerPtrunrun0382560004.10.2010 12:22:0904.10.2010 12:43:40Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
  
  74   Mon Oct 4 11:43:05 2010 Christian IrmlerPtrunrun0372560004.10.2010 11:40:1504.10.2010 12:15:03Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
  
  73   Mon Oct 4 10:43:45 2010 Marko DragicevicPtrunrun0362560004.10.2010 10:33:0504.10.2010 11:35:51Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
  
  72   Mon Oct 4 09:31:25 2010 Manfred ValentanPtrunrun0352560004.10.2010 09:28:40 Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
  
  71   Mon Oct 4 00:08:55 2010 Manfred ValentanPtrunrun03418700004.10.2010 00:03:1804.10.2010 09:22:07Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
  
  70   Sun Oct 3 22:53:49 2010 Manfred ValentanPtrunrun0332560003.10.2010 22.47:3804.10.2010 00:02:37Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
  
ELOG V3.1.5-fc6679b