Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 4 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Oct 3 22:53:49 2010, Manfred Valentan, Pt, run, run033, 25600, 03.10.2010 22.47:38, 04.10.2010 00:02:37 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
Entry  Mon Oct 4 09:31:25 2010, Manfred Valentan, Pt, run, run035, 25600, 04.10.2010 09:28:40,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
Entry  Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
Entry  Mon Oct 4 11:43:05 2010, Christian Irmler, Pt, run, run037, 25600, 04.10.2010 11:40:15, 04.10.2010 12:15:03 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
Entry  Mon Oct 4 12:24:38 2010, Erik Huemer, Pt, run, run038, 25600, 04.10.2010 12:22:09, 04.10.2010 12:43:40 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
Entry  Mon Oct 4 12:50:13 2010, Erik Huemer, Pt, run, run039 --> run out of air --> repeat, 25600, 04.10.2010 12:45:17, 04.10.2010 14:00:00 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 14:15:22 2010, Manfred Valentan, Pt, run, run040 --> unusable --> no bias, 25600, 04.10.2010 14:?:?, 04.10.2010 14:32:14 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 15:39:34 2010, Christian Irmler, Pt, run, run041, 25600, 04.10.2010 15:46:22,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 16:15:48 2010, Christian Irmler, Pt, run, run042, 25600, 04.10.2010 16:12:52, 04.10.2010 16:35:18 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
Entry  Tue Sep 28 13:04:02 2010, Markus Friedl, BELLE, run, run003, 25000, 28.09.2010 13:00:05, 28.09.2010 14:41:14 
now for real (previous run was at wrong position)
all same as run001, except position now still centered on p-strips, but on high edge (last APVs) for n side
position: 103 / 30 / 277.5
Entry  Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12 
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sat Oct 9 00:17:02 2010, Markus Friedl, BELLE, run, run056, 225k, 09.10.2010 00:15:53, 09.10.2010 09:54:28 
Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA  
cooling: Origami only, chiller set to -25°C, 
Entry  Wed Sep 29 19:01:28 2010, Markus Friedl, Micron Baby, run, run012, 2248, 29.09.2010 18:59:09, 29.09.2010 19:07:02 
micron baby stack
HV=100V I=11.0uA
Beam on
Entry  Thu Sep 30 14:45:16 2010, Thomas Bergauer, Micron Baby, run, run015, 22.5k, 30.09.2010 13:18:11, 30.09.2010 14:38:01 
micron baby stack angle scan 15 grad mit 3 modulen
HV=100V, I=3.8uA
Beam on
Entry  Tue Sep 28 23:23:47 2010, Markus Friedl, BELLE, run, run006, 2003, 28.09.2010 23:13:22, 28.09.2010 23:22:26 
channels swapped -> stopped
Entry  Wed Sep 29 11:53:16 2010, Erik Huemer, BELLE, run, run011, 19003, 29.09.2010 12:19:57, 29.09.2010 14:00:57 
Belle stack: Origami-Micron-Micron-Origami 
HV=100V, Ibias=83.22µA, beam on
no cooling
Entry  Mon Oct 4 00:08:55 2010, Manfred Valentan, Pt, run, run034, 187000, 04.10.2010 00:03:18, 04.10.2010 09:22:07 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
Entry  Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05 
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
Entry  Tue Sep 28 14:48:00 2010, Markus Friedl, BELLE, run, run004, 1755, 28.09.2010 14:48:28, 28.09.2010 15:06:31 
same as before, but now pos 1 is located on the other edge (-48mm from center)
telescope 7 / 30 / 277.5
telescope run 20079
Entry  Wed Oct 6 23:48:49 2010, Markus Friedl, BELLE, run, run052, 165789, 06.10.2010 23:47:12, 07.10.2010 08:43:42 
Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
ELOG V3.1.5-fc6679b