Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51
|
2 x SILC + 2 x ITE
HV=100V
|
Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48 |
Wed Oct 6 11:51:25 2010, Thomas Bergauer, Micron Baby, run, run049, 4489, 06.10.2010 11:38:21, 06.10.2010 11:49:23
|
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
not yet optimized XY-table positions (111/43.5/7.5) |
Tue Sep 28 15:09:16 2010, Markus Friedl, BELLE, run, run005, 40000, 28.09.2010 15:07:08, 28.09.2010 20:20:12
|
previous run stopped due to beam problem (shifted, broad, etc).
now recovered, restarting with same settings.
|
Tue Oct 5 10:20:30 2010, Manfred Valentan, BELLE, run, run46, 350000, 05.10.2010 01:00:00, 05.10.2010 10:16:07
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C |
Thu Sep 30 18:12:53 2010, Markus Friedl, Micron Baby, run, run017, 35000, 30.09.2010 18:11:53, 30.09.2010 20:22:43
|
micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on |
Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37
|
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA |
Thu Sep 30 15:39:53 2010, Markus Friedl, Micron Baby, run, run016, 31k, 30.09.2010 15:38:26, 30.09.2010 17:44:36
|
micron baby: 4 DUTs
HV=100V I=10.3uA (start of run); I=16.2uA (end of run)
Beam on |
Wed Sep 29 10:30:59 2010, Markus Friedl, BELLE, run, run009, 30000, 29.09.2010 10:27:27, 29.09.2010 11:06:35
|
zero suppressed (HIT4) @ FADC
Belle stack: Origami-Micron-Micron-Origami - HIT4
HV=100V, Ibias=28A, beam on |
Wed Sep 29 11:09:10 2010, Markus Friedl, BELLE, run, run010, 30000, 29.09.2010 11:08:03, 29.09.2010 11:50:07
|
zero suppressed (HIT5) @ FADC
Belle stack: Origami-Micron-Micron-Origami - HIT5
HV=100V, Ibias=28A, beam on |
Mon Oct 4 21:01:25 2010, Christian Irmler, BELLE, run, run43, 30000, 04.10.2010 20:59:48, 04.10.2010 23:04:24
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C |
Mon Oct 4 23:12:16 2010, Manfred Valentan, BELLE, run, run44, 30000, 04.10.2010 23:?:?, 04.10.2010 23.57.23
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C |
Tue Oct 5 10:23:09 2010, Manfred Valentan, BELLE, run, run47, 30000, 05.10.2010 10:21:20, 05.10.2010
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C |
Sat Oct 9 15:29:09 2010, Markus Friedl, BELLE, run, run058, 30000, 09.10.2010 15:26:50, 09.10.2010 16:21:37
|
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run) |
Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39
|
2 x SILC + 2 x ITE
HV=100V
telescope position: 107 |
Sat Oct 9 12:25:36 2010, Thomas Bergauer, BELLE, run, run057, 276475, 09.10.2010 12:22:21, 09.10.2010 15:08:46
|
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 degree |
Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25
|
micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on |
Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A |
Sun Oct 3 20:44:40 2010, Erik Huemer, Pt, run, run031, 25600, 03.10.2010 19:42:34,
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A |
Sun Oct 3 21:49:19 2010, Erik Huemer, Pt, run, run032, 25600, 03.10.2010 21:44:30, 03.10.2010 22.40.07
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A |
|