ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
59
|
Sat Oct 2 17:27:14 2010 |
Thomas Bergauer | ITE | cal | cal007 | 83800 | 02.10.2010 17:11:18 | |
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Beam on
one short only per sensor |
Attachment 1: intcal_ITE10PAD_W7.png
|
|
Attachment 2: intcal_ITE10PAD_W9.png
|
|
62
|
Sun Oct 3 08:14:39 2010 |
Markus Friedl | ITE | cal | cal008 | 83800 | 03.10.2010 08:13:06 | |
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
no beam (technical problem) |
63
|
Sun Oct 3 08:19:13 2010 |
Markus Friedl | ITE | run | run029 | 75000 | 03.10.2010 08:33:28 | 03.10.2010 10:50:27 |
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample! |
64
|
Sun Oct 3 14:35:12 2010 |
Marko Dragicevic | CNM | cal | cal009 | 83800 | 03.10.2010 13:50:54 | |
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam
calibration started after 1 hour warmup |
Attachment 1: cal009_cal_apv6.png
|
|
Attachment 2: cal009_cal_apv7.png
|
|
Attachment 3: slowcontrol_CNM_cal009.gif
|
|
66
|
Sun Oct 3 18:23:27 2010 |
Christian Irmler | Pt | cal | cal010 | 83800 | 03.10.2010 18:26:49 | |
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on
modules flushed with dry air
|
Attachment 1: slowcontrol_pt_cal010.gif
|
|
67
|
Sun Oct 3 18:52:56 2010 |
Christian Irmler | Pt | run | run030 | 25600 | 03.10.2010 19:16:29 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27
telescope run 20134 |
68
|
Sun Oct 3 20:44:40 2010 |
Erik Huemer | Pt | run | run031 | 25600 | 03.10.2010 19:42:34 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
HV=200V beam on
angle: 29
telescope run 20135 |
69
|
Sun Oct 3 21:49:19 2010 |
Erik Huemer | Pt | run | run032 | 25600 | 03.10.2010 21:44:30 | 03.10.2010 22.40.07 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 31
telescope run 20136 |
70
|
Sun Oct 3 22:53:49 2010 |
Manfred Valentan | Pt | run | run033 | 25600 | 03.10.2010 22.47:38 | 04.10.2010 00:02:37 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 33
telescope run 20138 |
71
|
Mon Oct 4 00:08:55 2010 |
Manfred Valentan | Pt | run | run034 | 187000 | 04.10.2010 00:03:18 | 04.10.2010 09:22:07 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
HV=200V beam on
angle: 37
telescope run 20139 |
72
|
Mon Oct 4 09:31:25 2010 |
Manfred Valentan | Pt | run | run035 | 25600 | 04.10.2010 09:28:40 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
HV=200V beam on
angle: 35 deg
telescope run 20140 |
73
|
Mon Oct 4 10:43:45 2010 |
Marko Dragicevic | Pt | run | run036 | 25600 | 04.10.2010 10:33:05 | 04.10.2010 11:35:51 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg
telescope run 20142 |
74
|
Mon Oct 4 11:43:05 2010 |
Christian Irmler | Pt | run | run037 | 25600 | 04.10.2010 11:40:15 | 04.10.2010 12:15:03 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
75
|
Mon Oct 4 12:24:38 2010 |
Erik Huemer | Pt | run | run038 | 25600 | 04.10.2010 12:22:09 | 04.10.2010 12:43:40 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
HV=200V beam on
angle: 43 deg
telescope run 20144 |
76
|
Mon Oct 4 12:50:13 2010 |
Erik Huemer | Pt | run | run039 --> run out of air --> repeat | 25600 | 04.10.2010 12:45:17 | 04.10.2010 14:00:00 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
run out of dry air --> h01 run into compliance --> HV turned off during run automatically --> has to be repeated
telescope run 20145 |
77
|
Mon Oct 4 14:15:22 2010 |
Manfred Valentan | Pt | run | run040 --> unusable --> no bias | 25600 | 04.10.2010 14:?:? | 04.10.2010 14:32:14 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 47 deg
telescope run 20146
bias voltage has been ramped down during run039 --> needs to be repeated. |
78
|
Mon Oct 4 15:39:34 2010 |
Christian Irmler | Pt | run | run041 | 25600 | 04.10.2010 15:46:22 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5
repetition of run039
telescope run20147 |
79
|
Mon Oct 4 16:15:48 2010 |
Christian Irmler | Pt | run | run042 | 25600 | 04.10.2010 16:12:52 | 04.10.2010 16:35:18 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
81
|
Mon Oct 4 20:16:19 2010 |
Christian Irmler | BELLE | cal | cal011 | 83800 | 04.10.2010 20:15:00 | |
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
HV connection of Origami 1 repaired |
82
|
Mon Oct 4 21:01:25 2010 |
Christian Irmler | BELLE | run | run43 | 30000 | 04.10.2010 20:59:48 | 04.10.2010 23:04:24 |
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)
telescope run: 20149 |