ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
115
|
Thu Mar 31 12:24:24 2011 |
Manfred Valentan | Micron Baby | DUT4, source run, post irrad, pre zupf | run101 | 100k | 31.03.2011 12:23:00 | 31.03.2011 12:36:48 |
DUT4
config file: micronbaby_multi6_irrrad_run101.cfg
HV=+-50V
90Sr 1mCi ~centered
I_start=128µA
I_end=155µA
|
113
|
Thu Mar 31 11:05:39 2011 |
Manfred Valentan | Micron Baby | DUT5, source run, post irrad, pre zupf | run100 | 100k | 31.03.2011 11:02:17 | 31.03.2011 11:15:41 |
DUT5
cal-file: micronbaby_multi6_irrad_run100.cfg
HV=+-50V
90Sr 1mCi ~centered
I_start=104µA
I_end=111µA
|
106
|
Sat Oct 9 15:29:09 2010 |
Markus Friedl | BELLE | run | run058 | 30000 | 09.10.2010 15:26:50 | 09.10.2010 16:21:37 |
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run)
cooling: chiller set to 15C
telescope run 20201
Origami p-side does not receive triggers -> disabled
origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...
|
|
105
|
Sat Oct 9 12:25:36 2010 |
Thomas Bergauer | BELLE | run | run057 | 276475 | 09.10.2010 12:22:21 | 09.10.2010 15:08:46 |
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 degree
HV=100V / 36 uA (beginning), 35uA (end of run)
cooling: chiller set to 15C
PROBLEM: wrong config file (single hit, not multi6)
telescope run 20200
Origami p-side does not receive triggers -> disabled
origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...
|
|
103
|
Sat Oct 9 00:17:02 2010 |
Markus Friedl | BELLE | run | run056 | 225k | 09.10.2010 00:15:53 | 09.10.2010 09:54:28 |
Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron (possibly due to burnt strip)
same position as in previous run
telescope run 20198 - now with correct telescope threshold settings
a lot of "Error detected in APV 21, subevent 2. Event discarded, reset sent." errors started at 09.10.2010 09:00:25 (after whole night without any error) |
102
|
Fri Oct 8 23:43:07 2010 |
Christian Irmler | BELLE | run | run055 | 12316 | 08.10.2010 23:42:51 | 09.10.2010 00:14:56 |
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
same position as in previous run
telescope run 20197 - wrong config file @ telescope -> new run with correct settings |
99
|
Fri Oct 8 18:12:43 2010 |
Markus Friedl | BELLE | run | run054 | 90000 | 08.10.2010 18:08:48 | 08.10.2010 21:49:36 |
Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
xy-table position 7 / 30 / 277.5 (shoots at the smaller edge of the trapezoidal sensor)
telescope run 20195 |
98
|
Fri Oct 8 18:12:15 2010 |
Christian Irmler | BELLE | run | run053 | 98000 | 08.10.2010 00:33:14 | 08.10.2010 13:36:57 |
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger
temperature of chiller set to 15°C
Analog signal of APVs #22 and #23 has been bound to ground after 1200 events. |
96
|
Wed Oct 6 23:48:49 2010 |
Markus Friedl | BELLE | run | run052 | 165789 | 06.10.2010 23:47:12 | 07.10.2010 08:43:42 |
Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
telescope run 20184
temperature of chiller set to 15°C
beam stopped at 7.10. 08:00 sharp, no beam until 8.10 - 8:00 according to SPS Page 1. We keep DAQ and telescope running and cross our fingers for at least some spills of particles.
Irradiated micron module 2, n-side: excessive hit count on channels at the edges of the APV chips - no such thing on the p-side |
93
|
Wed Oct 6 16:33:55 2010 |
Markus Friedl | Micron Baby | run | run051 | 90000 | 06.10.2010 16:32:03 | 06.10.2010 20:59:58 |
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
telescope position 131 / 53.5 / 7.5
no telescope run - being tuned (some intervals during data taking are possible)
|
92
|
Wed Oct 6 11:59:29 2010 |
Markus Friedl | Micron Baby | run | run050 | 90000 | 06.10.2010 11:57:55 | 06.10.2010 15:30:37 |
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
telescope position 118 / 41.1 / 7.5
no telescope run |
91
|
Wed Oct 6 11:51:25 2010 |
Thomas Bergauer | Micron Baby | run | run049 | 4489 | 06.10.2010 11:38:21 | 06.10.2010 11:49:23 |
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
not yet optimized XY-table positions (111/43.5/7.5) |
88
|
Tue Oct 5 18:13:05 2010 |
Christian Irmler | ITE | run | run048 | 533125 | 05.10.2010 18:14:57 | 06.10.2010 09:27:44 |
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155
DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal
beam on
modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C |
79
|
Mon Oct 4 16:15:48 2010 |
Christian Irmler | Pt | run | run042 | 25600 | 04.10.2010 16:12:52 | 04.10.2010 16:35:18 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
78
|
Mon Oct 4 15:39:34 2010 |
Christian Irmler | Pt | run | run041 | 25600 | 04.10.2010 15:46:22 | |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5
repetition of run039
telescope run20147 |
77
|
Mon Oct 4 14:15:22 2010 |
Manfred Valentan | Pt | run | run040 --> unusable --> no bias | 25600 | 04.10.2010 14:?:? | 04.10.2010 14:32:14 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 47 deg
telescope run 20146
bias voltage has been ramped down during run039 --> needs to be repeated. |
76
|
Mon Oct 4 12:50:13 2010 |
Erik Huemer | Pt | run | run039 --> run out of air --> repeat | 25600 | 04.10.2010 12:45:17 | 04.10.2010 14:00:00 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
run out of dry air --> h01 run into compliance --> HV turned off during run automatically --> has to be repeated
telescope run 20145 |
75
|
Mon Oct 4 12:24:38 2010 |
Erik Huemer | Pt | run | run038 | 25600 | 04.10.2010 12:22:09 | 04.10.2010 12:43:40 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
HV=200V beam on
angle: 43 deg
telescope run 20144 |
74
|
Mon Oct 4 11:43:05 2010 |
Christian Irmler | Pt | run | run037 | 25600 | 04.10.2010 11:40:15 | 04.10.2010 12:15:03 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
73
|
Mon Oct 4 10:43:45 2010 |
Marko Dragicevic | Pt | run | run036 | 25600 | 04.10.2010 10:33:05 | 04.10.2010 11:35:51 |
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg
telescope run 20142 |