  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN ;-) 
genau das gleiche wollte ich auch
gerade schreiben!
  
  108   Sat Oct 9 19:44:36 2010 Markus Friedlcommonend of success  09.10.2010 19:44:23NaN    
  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    eudetmac001.cern.ch
path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq
(Vienna system)
  
  106   Sat Oct 9 15:29:09 2010 Markus FriedlBELLErunrun0583000009.10.2010 15:26:5009.10.2010 16:21:37Origami1
(n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous
  
  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46 
Origami1 (n-side only) + Micron1
(non-irrad)
  
  104   Sat Oct 9 12:00:55 2010 Christian IrmlerBELLEcalcal0178380009.10.2010 11:59:37 Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA 
  
  103   Sat Oct 9 00:17:02 2010 Markus FriedlBELLErunrun056225k09.10.2010 00:15:5309.10.2010 09:54:28Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243
µA  
  
  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56 Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set
  
  101   Fri Oct 8 23:22:32 2010 Manfred ValentanBELLESchnittwinkel barrel vs. slanted    17deg acceptance => Schnittwinkel barrel
option = 90-17 = 73deg     
----->  rotary table 80.5
  
  100   Fri Oct 8 23:05:03 2010 Markus FriedlBELLEcalcal0168380008.10.2010 23:03:16 Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA 
cooling: Origami only, chiller set
  
  99   Fri Oct 8 18:12:43 2010 Markus FriedlBELLErunrun0549000008.10.2010 18:08:4808.10.2010 21:49:36 Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
  
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
  
  97   Fri Oct 8 17:26:36 2010 Markus FriedlBELLEcalcal0158380008.10.2010 17:22:44 Belle stack without Origami2
HV=11V I=32uA
beam on
  
  96   Wed Oct 6 23:48:49 2010 Markus FriedlBELLErunrun05216578906.10.2010 23:47:1207.10.2010 08:43:42Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
  
  95   Wed Oct 6 23:03:15 2010 Marko DragicevicBELLEcalcal0148380006.10.2010 23:01:5606.10.2010 23:34:07Belle stack without Origami2
HV=80V I=227uA
beam on
  
  94   Wed Oct 6 23:02:09 2010 Marko DragiceviccommonBeam Configuration    Beam Settings and Profile on 5.10.2010
- 17:00h
Saved as: H6B.801
 BeamProfile.gifBeamMagnets.gifBeamColli.gif 
  93   Wed Oct 6 16:33:55 2010 Markus FriedlMicron Babyrunrun0519000006.10.2010 16:32:0306.10.2010 20:59:588 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still
rising); 203uA (end of run)
  
  92   Wed Oct 6 11:59:29 2010 Markus FriedlMicron Babyrunrun0509000006.10.2010 11:57:5506.10.2010 15:30:378 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
  
  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:238 x Micron Baby (3 irradiated), no cooling
HV=100V
I=141uA (start of run)
beam on 
not yet optimized XY-table positions
  
  90   Wed Oct 6 11:03:59 2010 Marko DragicevicMicron Babycalcal0138380006.10.2010 11:03:12 8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
  