Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 5 of 6  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime
  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  104   Wed Aug 26 01:32:25 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun04310060026.08.2009 01:46:38 26.08.2009 07:10:14

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  59   Sat Aug 22 01:06:34 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode (cooling?)run0137500021.08.2009 23:49:38 22.08.2009 03:21:48

Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.

beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

trigger rate: about 300 - 500 ev / spill

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

  103   Tue Aug 25 20:21:31 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent moderun0428518925.08.2009 20:18:1826.08.2009 01:27:12

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_cut5_multi6.cfg

 

trigger rate about 3500 ev / spill

 

there was probably no water flow throught the pipe of the origami module during this run!

  44   Fri Aug 21 06:34:39 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHzrun0057500021.08.2009 06:10:4121.08.2009 10:37:33

was originally  run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

  105   Wed Aug 26 07:19:42 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun0441350426.08.2009 07:18:1926.08.2009 08:46:11 (beam shut down @ 8:00)

Belle DUT, HV=80V,  31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

  60   Sat Aug 22 03:27:13 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz transparent mode (cooling?)run01475k22.08.2009 03:25:2322.08.2009 07:08:09

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

  61   Sat Aug 22 08:32:02 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01575k22.08.2009 08:15:0522.08.2009 09:25:21

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

  62   Sat Aug 22 09:44:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01675k22.08.2009 09:42:3822.08.2009 10:24:05

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

  42   Fri Aug 21 06:24:10 2009 Christian IrmlerBELLEAPVDAQ + telescope (beam alignement)run6872578521.08.2009 00:12:2621.08.2009 00:27:11

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 

beam alignement
Origami is hit between in center of sensor (APV 1 and 2 on both sides)

  43   Fri Aug 21 06:31:29 2009 Christian IrmlerBELLEAPVDAQ + telescoperun68738017321.08.2009 00:47:3821.08.2009 06:07:02

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample

  47   Fri Aug 21 12:06:29 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0087500021.08.2009 11:15:0921.08.2009 11:29:53

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 4

  48   Fri Aug 21 12:06:39 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0097500021.08.2009 11:48:2221.08.2009 12:01:53

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 5

  45   Fri Aug 21 12:05:31 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHz hit moderun006interrupted21.08.2009 10:41:5121.08.2009 10:54:37

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

zero supressed w/o bad strip definition of origami module

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

 

 

  46   Fri Aug 21 12:06:06 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzrun007interrupted21.08.2009 11:06:4521.08.2009 11:10:40

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side

  49   Fri Aug 21 12:08:44 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzpedcorr003 21.08.2009 12:08:3321.08.2009 12:18:45

4 Belle DUTs
HV=80V, 40 MHz
pedestal correction
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 

  50   Fri Aug 21 12:22:43 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0107500021.08.2009 12:53:02 21.08.2009 13:35:01

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

ELOG V3.1.5-fc6679b