98
|
Tue Aug 25 12:30:04 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg NO air! | run037 | 20k | 25.08.2009 12:45 | 25.08.2009 13:40:13 |
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36 |
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 |
Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
55
|
Fri Aug 21 17:14:58 2009 |
Wolfgang Kiesenhofer | | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) | | | |
|
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | |
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
12
|
Tue Aug 11 14:03:57 2009 |
Marko Dragicevic | | Sensor Designs | | | | |
Screenshots
HEPHY Gallery
GDS File Viewer
KLayout Website
Layer Properties File Warsaw.lyp in den Attachments. |
5
|
Mon Jul 6 12:29:20 2009 |
Stephan Hänsel | SiLC | Sensors - layout | | | | |
Pt Modules:
CMS OB1 Sensors:
Optical Modules:
Sensors:
ITE Modules:
|
10
|
Fri Jul 17 14:03:21 2009 |
Stephan Hänsel | | What to measure | | | | |
Origami
Testbeam08 Module
- Anglescan
Pt Modules (2Stück - je 2 Sensoren):
Anglescan
- einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?)
wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!)
Optical Modules:(DAUER ca 18 Stunden)
- tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser)
ITE Modules:
- 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128)
- 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen)
zusätliche ideen:
- CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!)
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | |
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung). |
35
|
Thu Aug 20 19:12:23 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009 19:10:09 | 20.08.2009 19:11:57 |
|
39
|
Thu Aug 20 19:56:21 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser006 | 10k | 20.08.2009 19:54:04 | 20.08.2009 19:55:38 |
|
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | |
manually changed TRIM3, TRIM4 and TRIM6 |
25
|
Thu Aug 20 11:23:04 2009 |
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009 11:09:50 | 20.08.2009 11:25:16 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:141.3 (center- center, point 1) |
65
|
Sat Aug 22 11:54:49 2009 |
Thomas Bergauer | common | beam profile | | | | |
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | |
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)
Particle Production Applet
Calculator applet
For +120 Gev/c beam:
Pi+ |
55.67 % |
p |
38.95 % |
K+ |
5.38 % |
|
31
|
Thu Aug 20 15:15:33 2009 |
Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009 14:56:16 | 20.08.2009 15:14:11 |
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:155 (bottom center on sensor in beam direction) |
30
|
Thu Aug 20 14:31:29 2009 |
Christian Irmler | alignment_beam | bottom left on sensor, point 5 | run6868 | 10600 | 20.08.2009 14:36:00 | 20.08.2009 14:51:57 |
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:57 y:155 (bottom left on sensor in beam direction) |
29
|
Thu Aug 20 12:50:59 2009 |
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009 12:51:04 | 20.08.2009 13:05:01 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:155 (bottom right on sensor in beam direction) |
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | |
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
3 SiLC DUTs mit je ca. 38nA
h07-ITE-512: 3.77uA
h05-ITE-512: breakthrough
h06-ITE-512: breakthrough |
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | |
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
23
|
Thu Aug 20 10:48:39 2009 |
Christian Irmler | alignment_beam | internal calibration | cal002 | | 20.08.2009 10:49:07 | 20.08.2009 10:59:43 |
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
no beam
module 1 (h03) is used w inverter off and higher base line |