57
|
Fri Aug 21 18:35:13 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009 18:31:01 | 21.08.2009 23:25:03 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized |
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
50
|
Fri Aug 21 12:22:43 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009 12:53:02 | 21.08.2009 13:35:01 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
48
|
Fri Aug 21 12:06:39 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009 11:48:22 | 21.08.2009 12:01:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 5 |
47
|
Fri Aug 21 12:06:29 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009 11:15:09 | 21.08.2009 11:29:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 4 |
46
|
Fri Aug 21 12:06:06 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | run007 | interrupted | 21.08.2009 11:06:45 | 21.08.2009 11:10:40 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side |
45
|
Fri Aug 21 12:05:31 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009 10:41:51 | 21.08.2009 10:54:37 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
zero supressed w/o bad strip definition of origami module
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
|
44
|
Fri Aug 21 06:34:39 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009 06:10:41 | 21.08.2009 10:37:33 |
was originally run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
|
25
|
Thu Aug 20 11:23:04 2009 |
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009 11:09:50 | 20.08.2009 11:25:16 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:141.3 (center- center, point 1) |
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 139.3100
ITE128 shooting into strips w pitch adapter, upper edge of sensor |
19
|
Wed Aug 19 22:56:07 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009 22:54:23 | 20.08.2009 00:11:31 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 144.3099
ITE128 shooting into strips w pitch adapter, upper position |
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | |
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |
55
|
Fri Aug 21 17:14:58 2009 |
Wolfgang Kiesenhofer | | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) | | | |
|
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | |
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
18
|
Wed Aug 19 20:43:14 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009 20:42:08 | 19.08.2009 22:54:21 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 154.0979
ITE128 shooting into strips w/o pitch adapter, low position |
82
|
Sun Aug 23 17:18:25 2009 |
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 | | 23.08.2009 17:17:36 | |
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
76
|
Sat Aug 22 23:06:22 2009 |
Christian Irmler | BELLE | pedestal correction 40 MHz transparent mode + cooling | pedcorr007 | | 22.08.2009 23:04:29 | 22.08.2009 23:13:51 |
Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
72
|
Sat Aug 22 15:28:00 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode + cooling | pedcorr006 | | 22.08.2009 15:25:35 | 22.08.2009 15:36:00 |
Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
69
|
Sat Aug 22 13:34:14 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode (cooling?) | pedcorr005 | | 22.08.2009 13:31:27 | 22.08.2009 13:41:42 |
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.
external 31.8 MHz clock
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated! |
56
|
Fri Aug 21 18:07:57 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz | pedcorr004 | | 21.08.2009 17:49:10 | 21.08.2009 18:24:31 |
4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
transparent mode
beam on
|