  HEPHY logbook for testbeam at SPS June 2009, Page 1 of 6  Not logged in ELOG logo
Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=112.31

Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=111.31

Entry  Fri Aug 21 18:35:13 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode, run012, 60000, 21.08.2009 18:31:01, 21.08.2009 23:25:03 

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

Entry  Fri Aug 21 18:07:57 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz, pedcorr004, , 21.08.2009 17:49:10, 21.08.2009 18:24:31 

4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
transparent mode
beam on
 

Entry  Fri Aug 21 12:22:43 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run010, 75000, 21.08.2009 12:53:02, 21.08.2009 13:35:01 

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

Entry  Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,  

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

Entry  Fri Aug 21 12:06:06 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, run007, interrupted, 21.08.2009 11:06:45, 21.08.2009 11:10:40 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side

Entry  Fri Aug 21 12:08:44 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, pedcorr003, , 21.08.2009 12:08:33, 21.08.2009 12:18:45  

4 Belle DUTs
HV=80V, 40 MHz
pedestal correction
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 

Entry  Fri Aug 21 12:05:31 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz hit mode, run006, interrupted, 21.08.2009 10:41:51, 21.08.2009 10:54:37 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

zero supressed w/o bad strip definition of origami module

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

 

 

Entry  Fri Aug 21 12:06:29 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run008, 75000, 21.08.2009 11:15:09, 21.08.2009 11:29:53 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 4

Entry  Fri Aug 21 12:06:39 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run009, 75000, 21.08.2009 11:48:22, 21.08.2009 12:01:53 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 5

Entry  Fri Aug 21 06:31:29 2009, Christian Irmler, BELLE, APVDAQ + telescope, run6873, 80173, 21.08.2009 00:47:38, 21.08.2009 06:07:02 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample

Entry  Fri Aug 21 06:24:10 2009, Christian Irmler, BELLE, APVDAQ + telescope (beam alignement), run6872, 5785, 21.08.2009 00:12:26, 21.08.2009 00:27:11 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 

beam alignement
Origami is hit between in center of sensor (APV 1 and 2 on both sides)

Entry  Sat Aug 22 08:32:02 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run015, 75k, 22.08.2009 08:15:05, 22.08.2009 09:25:21 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 09:44:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run016, 75k, 22.08.2009 09:42:38, 22.08.2009 10:24:05 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 03:27:13 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz transparent mode (cooling?), run014, 75k, 22.08.2009 03:25:23, 22.08.2009 07:08:09 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 15:52:33 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run019, 75k, 22.08.2009 15:50:40, 22.08.2009 19:14:21 

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009 07:18:19, 26.08.2009 08:46:11 (beam shut down @ 8:00) 

Belle DUT, HV=80V,  31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Fri Aug 21 06:34:39 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz, run005, 75000, 21.08.2009 06:10:41, 21.08.2009 10:37:33 

was originally  run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 