Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Project Subject Run Number Events StartTime EndTime Text Attachments
  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14),  module 6 (standard
 stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf 
  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise.
 stripcorr_modall_thrs3_ktau.pdf 
  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices.
 sn-pos_h13-h14_strips_pa_5bins.pdf 
  105   Wed Aug 26 07:19:42 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun0441350426.08.2009 07:18:1926.08.2009 08:46:11 (beam shut down @ 8:00)Belle DUT, HV=80V,  31.8 MHz, 120
GeV
6 samples, transparent mode
  
  104   Wed Aug 26 01:32:25 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun04310060026.08.2009 01:46:38 26.08.2009 07:10:14Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg,
  
  103   Tue Aug 25 20:21:31 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent moderun0428518925.08.2009 20:18:1826.08.2009 01:27:12Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
  
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009Pt: 40 Grad, HV=200V, 36.9% (start run)
to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
  
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
 Pt-17deg.png 
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38Pt: 10 Grad, HV=200V, 31.7% (start run)
to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13Pt: 8 Grad, HV=200V, 28% (start run) to
31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table:
  
  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55Pt: 6 Grad, HV=200V, 20% (start run)
to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00Pt: 4 Grad, HV=200V, 0% (start run) to
14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45: Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    manually changed TRIM3, TRIM4 and TRIM6  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg 
  93   Tue Aug 25 01:33:18 2009 Georg AuzingerPt_ITE512Pt_ITE512 0deg airrun03315172425.08.09 01:35:1825.08.2009 08:44:27Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
 
no
  
  91   Mon Aug 24 22:04:56 2009 Georg AuzingerPt_ITE512Pt_ITE512 13deg airrun03120k24.08.09 20:53:5024.08.09 22:00:49Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  90   Mon Aug 24 18:30:07 2009 Georg AuzingerPt_ITE512Pt_ITE512 11deg airrun03020k24.08.09 18:45:0924.08.09 20:37:04Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
ELOG V3.1.5-fc6679b