Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Aug 21 12:05:31 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz hit mode, run006, interrupted, 21.08.2009 10:41:51, 21.08.2009 10:54:37 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

zero supressed w/o bad strip definition of origami module

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

 

 

Entry  Fri Aug 21 12:06:06 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, run007, interrupted, 21.08.2009 11:06:45, 21.08.2009 11:10:40 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side

Entry  Tue Aug 25 20:21:31 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode, run042, 85189, 25.08.2009 20:18:18, 26.08.2009 01:27:12 

Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:

APV #
n-side
p-side
JP
1/2
1/2
Origami
2/3
1/2
Flex
1/2
1/2
Micron
0/1
1/2

 

Entry  Thu Aug 20 12:50:59 2009, Christian Irmler, alignment_beam, bottom right on sensor, point 4, run6866, 8467, 20.08.2009 12:51:04, 20.08.2009 13:05:01 

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:43 y:155 (bottom right on sensor in beam direction)

Entry  Fri Aug 21 06:31:29 2009, Christian Irmler, BELLE, APVDAQ + telescope, run6873, 80173, 21.08.2009 00:47:38, 21.08.2009 06:07:02 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample

Entry  Sat Aug 22 03:27:13 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz transparent mode (cooling?), run014, 75k, 22.08.2009 03:25:23, 22.08.2009 07:08:09 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 08:32:02 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run015, 75k, 22.08.2009 08:15:05, 22.08.2009 09:25:21 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Sat Aug 22 09:44:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run016, 75k, 22.08.2009 09:42:38, 22.08.2009 10:24:05 

 HV=80V, 31.8 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=31.8 MHz

config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 10:28:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run017, 75k, 22.08.2009 10:26:28, 22.08.2009 11:16:12 

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=4
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_multi6.cfg

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 11:26:00 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run018, 75k, 22.08.2009 11:16:57, 22.08.2009 11:58:56 

 HV=80V, 40 MHz, beam on, 120 GeV

6 samples, hit mode, hitcut=5
chiller set to 13 deg.
 

f=40 MHz

config file: cern09_belle_hit_cut5_multi6.cfg

 

trigger rate about 3500 ev / spill

 

there was probably no water flow throught the pipe of the origami module during this run!

Entry  Sat Aug 22 15:52:33 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run019, 75k, 22.08.2009 15:50:40, 22.08.2009 19:14:21 

Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Sat Aug 22 19:19:20 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run020, 75k, 22.08.2009 19:17:29, 22.08.2009 22:09:53 

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

Entry  Fri Aug 21 06:34:39 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz, run005, 75000, 21.08.2009 06:10:41, 21.08.2009 10:37:33 

was originally  run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height):  94.3

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

Entry  Fri Aug 21 12:06:29 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run008, 75000, 21.08.2009 11:15:09, 21.08.2009 11:29:53 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 4

Entry  Fri Aug 21 12:06:39 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run009, 75000, 21.08.2009 11:48:22, 21.08.2009 12:01:53 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

same as run6873, but w improved timing  --> peak is now at sample 2 or 3

since eudetmac was not reachable by VNC, the telescope has not been restarted !

 

zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side

hit cut = 5

Entry  Fri Aug 21 12:22:43 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run010, 75000, 21.08.2009 12:53:02, 21.08.2009 13:35:01 

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

Entry  Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,  

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

Entry  Sat Aug 22 01:06:34 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode (cooling?), run013, 75000, 21.08.2009 23:49:38 , 22.08.2009 03:21:48 

Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.

beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

trigger rate: about 300 - 500 ev / spill

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated

Entry  Thu Aug 20 15:15:33 2009, Christian Irmler, alignment_beam, bottom center on sensor, point 6, run6869, 615 (beam manipulation by students), 20.08.2009 14:56:16 , 20.08.2009 15:14:11 

2 alignment modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:50 y:155 (bottom center on sensor in beam direction)

Entry  Fri Aug 21 18:35:13 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode, run012, 60000, 21.08.2009 18:31:01, 21.08.2009 23:25:03 

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

APVDAQ and telescope runs are not synchronized

ELOG V3.1.5-fc6679b