Sun Jun 1 15:08:17 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0003, 100000, 01.06.2008 15:05:51, 01.06.2008 15:33:58
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 23:23:16 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0004, 100000, 01.06.2008 23:21:12, 01.06.2008 23:41:09
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 20:13:37 2008, Eudet Telescope, SiLC, BZIP2 compressed APVDAQ data, , , ,
|
[b]Processed APVDAQ data_cluster - in tar.bzip2 format:[/b]
- on machine: eudetmac001.cern.ch
|
Mon May 19 15:21:49 2008, Markus Friedl, other, CERN SPS page 1, , , ,
|
SPS Status
SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm
Linac, |
Tue Jun 17 09:43:07 2008, Thomas Bergauer, , Data analysis progress, overview (in progress), , ,
|
[TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit data processed|hitfit processed
|-
|
Fri May 9 11:46:36 2008, Markus Friedl, SiLC, Data file format, (work in progress), , ,
|
APVDAQ Data Analysis
====================
|
Wed May 7 10:43:09 2008, Thomas Bergauer, SiLC, Documentation: twiki, Stephans Hardware Drawings,...., , , ,
|
DUT, APVDAQ Documentation
CERN TWiki: https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
Stephan's Documentation: http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/
|
Tue May 6 13:51:43 2008, Thomas Bergauer, other, Equipment list, , , ,
|
[B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
|
Mon May 26 15:38:53 2008, Markus Friedl, SiLC, How to run APVDAQ, , , ,
|
Power-on Procedure
==================
|
Sun Jun 1 23:36:21 2008, Christian Irmler, SiLC, HowTo analyse data, , , ,
|
The analysis consists of two stages:
[LIST]
[*] The first is zero supression an cluster finding done with "apvdaq_analysis_fadc" (Labwindows/CVI application)
|
Fri May 30 10:36:18 2008, Marko Dragicevic, other, Important Information/Contact, , , ,
|
[B]IPs[/B]
Linksys Router
[LIST]
|
Wed May 14 16:15:30 2008, Markus Friedl, BELLE, Micron DDD5 Photos, , , ,
|
This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.
The p-side flex hybrid sits at the edge of the sensor, while the n-side flex hybrid is located on top of about
|
Fri May 23 15:17:49 2008, Markus Friedl, SiLC, Module/chip/strip/zone numbering scheme, (work in progress), , ,
|
The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
The spacing between each of the 8 layers is 20mm. Seen with the beam, the fourth layer is exactly centered
between the telescope legs. This means that the stack as a whole is not exactly centered, as there is no
|
Wed May 7 16:28:23 2008, stephan hänsel, SiLC, Photos, , , ,
|
Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview of module (without cover)[/URL]
|
Fri May 9 15:29:28 2008, Thomas Bergauer, SiLC, Sensor Layout, , , ,
|
pplus strip
|
Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58
|
Telescope Pedestal Run
no DUTs!
no Beam!
|
Mon May 19 15:14:40 2008, Markus Friedl, other, Tentative Beam Test Schedule, , , ,
|
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
|
Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,
|
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
|
Sat May 31 18:33:50 2008, Thomas Bergauer, other, beam profile, , , ,
|
[SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
|
Wed May 14 09:21:39 2008, stephan hänsel, SiLC, capacity measurements - HPK-ILC-TS-6687-24, , , ,
|
ich hab mal die Kapazitäts-Messungen vom Thomas in ein Diagram gegeben
interessant ist, dass die Kapazität mit 2 intermediate strips (int. strips) kleiner ist als mit einem int. strip -> das bedeutet, dass der eine int. strip |
|