ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
14
|
Fri May 30 19:42:13 2008 |
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008 19:38:04 | 30.05.2008 22:54:59 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|
56
|
Tue Jun 3 10:58:54 2008 |
Markus Friedl | BELLE | APVDAQ only | ped007 | 10000 | 03.06.2008 10:53:04 | 03.06.2008 10:58:47 | SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
|
32
|
Sun Jun 1 23:20:10 2008 |
Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008 23:16:52 | 01.06.2008 23:19:59 | SiLC beam test - CERN SPS June 2008 - PEDESTAL
with beam
8 modules, HV=100V, 40MHz, 6 samples, hor |
|
25
|
Sun Jun 1 15:02:51 2008 |
Markus Friedl | SiLC | APVDAQ only | ped003 | 10000 | 01.06.2008 15:00:54 | 01.06.2008 15:04:14 | SiLC beam test - CERN SPS June 2008 - PEDESTAL
with beam
8 modules, HV=100V, 40MHz, 6 samples, hor |
|
24
|
Sun Jun 1 14:58:53 2008 |
Markus Friedl | SiLC | APVDAQ only | ped002 | 10000 | 01.06.2008 14:55:31 | 01.06.2008 14:59:06 | SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
|
|
68
|
Tue Jun 17 09:43:07 2008 |
Thomas Bergauer | | Data analysis progress | overview (in progress) | | | | [TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit
data processed|hitfit processed
|
|
4
|
Fri May 9 11:46:36 2008 |
Markus Friedl | SiLC | Data file format | (work in progress) | | | | APVDAQ Data Analysis
====================
|
|
10
|
Fri May 23 15:17:49 2008 |
Markus Friedl | SiLC | Module/chip/strip/zone numbering scheme | (work in progress) | | | | The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers |
|
59
|
Tue Jun 3 12:41:22 2008 |
Eudet Telescope | | useful eudaq software commands | (work in progress) | | | | [b]to show information about a run (number
of events, start and end timestamp,....:[/b]
./TestReader.exe -b -e 2828 |
|
1
|
Tue May 6 13:51:43 2008 |
Thomas Bergauer | other | Equipment list | | | | | [B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
|
|
2
|
Wed May 7 10:43:09 2008 |
Thomas Bergauer | SiLC | Documentation: twiki, Stephans Hardware Drawings,.... | | | | | DUT, APVDAQ Documentation
CERN TWiki:
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
|
|
3
|
Wed May 7 16:28:23 2008 |
stephan hänsel | SiLC | Photos | | | | | Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview |
|
5
|
Fri May 9 15:29:28 2008 |
Thomas Bergauer | SiLC | Sensor Layout | | | | |
|
|
6
|
Wed May 14 09:21:39 2008 |
stephan hänsel | SiLC | capacity measurements - HPK-ILC-TS-6687-24 | | | | | ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
|
|
7
|
Wed May 14 16:15:30 2008 |
Markus Friedl | BELLE | Micron DDD5 Photos | | | | | This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
|
|
8
|
Mon May 19 15:14:40 2008 |
Markus Friedl | other | Tentative Beam Test Schedule | | | | | Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
|
|
9
|
Mon May 19 15:21:49 2008 |
Markus Friedl | other | CERN SPS page 1 | | | | | SPS Status
SPS
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
|
|
11
|
Mon May 26 15:38:53 2008 |
Markus Friedl | SiLC | How to run APVDAQ | | | | | Power-on Procedure
==================
|
|
12
|
Fri May 30 10:36:18 2008 |
Marko Dragicevic | other | Important Information/Contact | | | | | [B]IPs[/B]
Linksys Router
[LIST]
|
|
15
|
Sat May 31 13:34:28 2008 |
Thomas Bergauer | | how to copy data from lab2pc to eudetmac | | | | | rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/ |
|