Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 3 of 4  Not logged in ELOG logo
Entry  Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06 
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
Entry  Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
Entry  Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Entry  Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
Entry  Tue May 6 13:51:43 2008, Thomas Bergauer, other, Equipment list, , , ,  
[B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
Entry  Wed May 7 10:43:09 2008, Thomas Bergauer, SiLC, Documentation: twiki, Stephans Hardware Drawings,...., , , ,  
DUT, APVDAQ Documentation
CERN TWiki: https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam

Stephan's Documentation: http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/
Entry  Wed May 7 16:28:23 2008, stephan hänsel, SiLC, Photos, , , ,  module-top.jpgmodule-bottom.jpg8Modules.jpg
Module Photos

[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview of module (without cover)[/URL]
Entry  Fri May 9 11:46:36 2008, Markus Friedl, SiLC, Data file format, (work in progress), , ,  
APVDAQ Data Analysis
====================
Entry  Fri May 9 15:29:28 2008, Thomas Bergauer, SiLC, Sensor Layout, , , ,  test-AC-2.pdf070516-SiLC_WaferLayout.pdf

    
    
        
             
            pplus strip
            
Entry  Wed May 14 09:21:39 2008, stephan hänsel, SiLC, capacity measurements - HPK-ILC-TS-6687-24, , , ,  capacity-TS24.epscapacity_measurements_ACTS-24.opj
ich hab mal die Kapazitäts-Messungen vom Thomas in ein Diagram gegeben

interessant ist, dass die Kapazität mit 2 intermediate strips (int. strips) kleiner ist als mit einem int. strip -> das bedeutet, dass der eine int. strip
Entry  Wed May 14 16:15:30 2008, Markus Friedl, BELLE, Micron DDD5 Photos, , , ,  micron_pside.jpgmicron_nside.jpgmicron_pside_detail.jpgmicron_nside_detail.jpg
This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.

The p-side flex hybrid sits at the edge of the sensor, while the n-side flex hybrid is located on top of about
Entry  Mon May 19 15:14:40 2008, Markus Friedl, other, Tentative Beam Test Schedule, , , ,  
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
Entry  Mon May 19 15:21:49 2008, Markus Friedl, other, CERN SPS page 1, , , ,  
SPS Status
SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html

Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm

Linac,
Entry  Fri May 23 15:17:49 2008, Markus Friedl, SiLC, Module/chip/strip/zone numbering scheme, (work in progress), , ,  telescope_single_dut.giftelescope_8_dut.gifsilc_dut_stack_beam.jpgsilc_dut_beam.jpg
The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
The spacing between each of the 8 layers is 20mm. Seen with the beam, the fourth layer is exactly centered
between the telescope legs. This means that the stack as a whole is not exactly centered, as there is no
Entry  Mon May 26 15:38:53 2008, Markus Friedl, SiLC, How to run APVDAQ, , , ,  panel_instruction.gifcern08_silc_all_single.cfgcern08_silc_all_multi6.cfgcern08_silc_mod03_single.cfgcern08_silc_mod03_multi6.cfg
Power-on Procedure
==================
Entry  Fri May 30 10:36:18 2008, Marko Dragicevic, other, Important Information/Contact, , , ,  
[B]IPs[/B]
Linksys Router
[LIST]
Entry  Sat May 31 13:34:28 2008, Thomas Bergauer, , how to copy data from lab2pc to eudetmac, , , ,  
rsync -rltvz --exclude "data_vie" --exclude "hitfit_cern08" --exclude "output_vie" --exclude "run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
/Volumes/Data/eudet/APVDAQ/
Entry  Sat May 31 18:33:50 2008, Thomas Bergauer, other, beam profile, , , ,  Picture_1.pngbeamline_settings.png
[SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Entry  Sun Jun 1 17:01:12 2008, Thomas Bergauer, SiLC, path do data, , , ,  
[SIZE=4]The data of all runs are stored on eudetmac001.cern.ch:[/SIZE]

[b]APVDAQ:[/b] /Volumes/Data/eudet/APVDAQ/silc/data
Entry  Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,  silc_verysimple_res_2REF4.pngsilc_verysimple_res_012REF4567.png
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
ELOG V3.1.5-fc6679b