Entry  Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06 
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
no telescope

PEDESTAL with BEAM (10k events) @ LEFT
Entry  Sun Jun 1 15:02:51 2008, Markus Friedl, SiLC, APVDAQ only, ped003, 10000, 01.06.2008 15:00:54, 01.06.2008 15:04:14 
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope

PEDESTAL WITH BEAM (10k) @ MID
Entry  Sun Jun 1 23:20:10 2008, Markus Friedl, SiLC, APVDAQ only, ped004, 10000, 01.06.2008 23:16:52, 01.06.2008 23:19:59 
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope

this is RIGHT position
Entry  Tue Jun 3 10:58:54 2008, Markus Friedl, BELLE, APVDAQ only, ped007, 10000, 03.06.2008 10:53:04, 03.06.2008 10:58:47 
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity)
Entry  Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope

terminated after 51803 events due to beam drop out @ 22.00h
Entry  Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill
Entry  Sun Jun 1 15:08:17 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0003, 100000, 01.06.2008 15:05:51, 01.06.2008 15:33:58 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill
Entry  Sun Jun 1 23:23:16 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0004, 100000, 01.06.2008 23:21:12, 01.06.2008 23:41:09 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz)
Entry  Tue Jun 3 09:12:42 2008, Markus Friedl, BELLE, APVDAQ only, run0005, 45020, 03.06.2008 09:11:30, 03.06.2008 09:24:42 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE


stuck after 45020 events with the repeated message  
 ***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated.
Entry  Tue Jun 3 09:27:27 2008, Markus Friedl, BELLE, APVDAQ only, run0006, 23929, 03.06.2008 09:26:16, 03.06.2008 09:34:22 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY

STUCK again after some time - now adding veto clear in error handling routine
Entry  Tue Jun 3 09:57:17 2008, Markus Friedl, BELLE, APVDAQ only, run0007, 105000, 03.06.2008 09:40:18, 03.06.2008 10:12:48 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY after software bugfix - apparently works
Entry  Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm
Entry  Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm
Entry  Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

- long break in the middle due to power outage after thunderstorm

horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position

all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm
Entry  Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

horizontal position ("target") = -2.75mm
this is MID position
Entry  Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,  silc_verysimple_res_2REF4.pngsilc_verysimple_res_012REF4567.png
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).

Results: 
 Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
 Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment
Entry  Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
Entry  Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
Entry  Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58 
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf
Entry  Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

right from the start: no beam...
ELOG V3.1.5-fc6679b