24
|
Sun Jun 1 14:58:53 2008 |
Markus Friedl | SiLC | APVDAQ only | ped002 | 10000 | 01.06.2008 14:55:31 | 01.06.2008 14:59:06 | SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
no telescope
PEDESTAL with BEAM (10k events) @ LEFT |
25
|
Sun Jun 1 15:02:51 2008 |
Markus Friedl | SiLC | APVDAQ only | ped003 | 10000 | 01.06.2008 15:00:54 | 01.06.2008 15:04:14 | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope
PEDESTAL WITH BEAM (10k) @ MID |
32
|
Sun Jun 1 23:20:10 2008 |
Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008 23:16:52 | 01.06.2008 23:19:59 | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position |
56
|
Tue Jun 3 10:58:54 2008 |
Markus Friedl | BELLE | APVDAQ only | ped007 | 10000 | 03.06.2008 10:53:04 | 03.06.2008 10:58:47 | SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
14
|
Fri May 30 19:42:13 2008 |
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008 19:38:04 | 30.05.2008 22:54:59 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
terminated after 51803 events due to beam drop out @ 22.00h |
23
|
Sun Jun 1 14:36:23 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0002 | 100000 | 01.06.2008 14:25:43 | 01.06.2008 14:54:14 | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |
26
|
Sun Jun 1 15:08:17 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0003 | 100000 | 01.06.2008 15:05:51 | 01.06.2008 15:33:58 | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |
33
|
Sun Jun 1 23:23:16 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0004 | 100000 | 01.06.2008 23:21:12 | 01.06.2008 23:41:09 | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz) |
53
|
Tue Jun 3 09:12:42 2008 |
Markus Friedl | BELLE | APVDAQ only | run0005 | 45020 | 03.06.2008 09:11:30 | 03.06.2008 09:24:42 | SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE
stuck after 45020 events with the repeated message
***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated. |
54
|
Tue Jun 3 09:27:27 2008 |
Markus Friedl | BELLE | APVDAQ only | run0006 | 23929 | 03.06.2008 09:26:16 | 03.06.2008 09:34:22 | SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY
STUCK again after some time - now adding veto clear in error handling routine |
55
|
Tue Jun 3 09:57:17 2008 |
Markus Friedl | BELLE | APVDAQ only | run0007 | 105000 | 03.06.2008 09:40:18 | 03.06.2008 10:12:48 | SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY after software bugfix - apparently works |
16
|
Sat May 31 17:29:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008 14:59:26 | 31.05.2008 15:56:23 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm |
17
|
Sat May 31 17:32:35 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2717 | 6490 | 31.05.2008 15:57:58 | 31.05.2008 16:09:21 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm |
18
|
Sat May 31 17:36:14 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2718 | 100000 | 31.05.2008 16:21:57 | 31.05.2008 21:08:32 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
- long break in the middle due to power outage after thunderstorm
horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position
all 3 positions are:
RIGHT: +2.00 mm <--- this run
MID: -2.75 mm
LEFT: -7.50 mm |
20
|
Sat May 31 22:54:29 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2719 | 100000 | 31.05.2008 22:34:38 | 01.06.2008 01:49:30 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
horizontal position ("target") = -2.75mm
this is MID position |
30
|
Sun Jun 1 18:23:38 2008 |
Markus Friedl | SiLC | Very simple tracking | run2719 | 100000 | | | Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).
Results:
Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment |
21
|
Sun Jun 1 01:56:47 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2720 | 100000 | 01.06.2008 01:51:45 | 01.06.2008 07:48:09 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
22
|
Sun Jun 1 08:06:57 2008 |
stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
27
|
Sun Jun 1 15:52:03 2008 |
Eudet Telescope | SiLC | Telescope Pedestal Run | run2738 | 1247 | 1.6.2008. 15:50 | 1.6.2008. 15:58 | Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf |
28
|
Sun Jun 1 16:06:42 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2741 - run2757 | 22000 | 01.06.2008 16:02:56 | 01.06.2008 22:02:34 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |
|