Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 2 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm
Entry  Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

- long break in the middle due to power outage after thunderstorm

horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position

all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm
Entry  Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

horizontal position ("target") = -2.75mm
this is MID position
Entry  Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
Entry  Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
Entry  Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill
Entry  Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06 
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
no telescope

PEDESTAL with BEAM (10k events) @ LEFT
Entry  Sun Jun 1 15:02:51 2008, Markus Friedl, SiLC, APVDAQ only, ped003, 10000, 01.06.2008 15:00:54, 01.06.2008 15:04:14 
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope

PEDESTAL WITH BEAM (10k) @ MID
Entry  Sun Jun 1 15:08:17 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0003, 100000, 01.06.2008 15:05:51, 01.06.2008 15:33:58 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill
Entry  Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58 
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf
Entry  Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

right from the start: no beam...
Entry  Sun Jun 1 17:01:12 2008, Thomas Bergauer, SiLC, path do data, , , ,  
The data of all runs are stored on eudetmac001.cern.ch:

APVDAQ: /Volumes/Data/eudet/APVDAQ/silc/data

Telescope data: /Volumes/Data/eudet/Data/testing

all data will be saved to an external Firewire disk (Vienna Backup) and to CASTOR
Entry  Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,  silc_verysimple_res_2REF4.pngsilc_verysimple_res_012REF4567.png
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).

Results: 
 Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
 Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment
Entry  Sun Jun 1 20:13:37 2008, Eudet Telescope, SiLC, BZIP2 compressed APVDAQ data, , , ,  
Processed APVDAQ data_cluster - in tar.bzip2 format:

- on machine: eudetmac001.cern.ch
- in directory: /Volumes/Data/eudet/APVDAQ/silc/data_bz2
- size reduction by factor 6
- in order to extract files, write: tar -xjf name.tar.bz2

Zbynek
Entry  Sun Jun 1 23:20:10 2008, Markus Friedl, SiLC, APVDAQ only, ped004, 10000, 01.06.2008 23:16:52, 01.06.2008 23:19:59 
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope

this is RIGHT position
Entry  Sun Jun 1 23:23:16 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0004, 100000, 01.06.2008 23:21:12, 01.06.2008 23:41:09 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz)
Entry  Sun Jun 1 23:36:21 2008, Christian Irmler, SiLC, HowTo analyse data, , , ,  analysis_howto.jpg
The analysis consists of two stages:
  • The first is zero supression an cluster finding done with "apvdaq_analysis_fadc" (Labwindows/CVI application)
  • The second stage is hit time reconstruction done with ROOT. (hitfit)
Both are installed on EUDETMAC.

apvdaq_analysis_fadc:
  • start apvdaq_analysis_fadc within the virtal Windows XP machine (parallels).
  • select a runfile, e.g. run0001.dat
  • select a propper calibration file, default is "cal002.out"
  • select pedestal correction file, default is "pedcorr001.ped"
  • enable "generate hit file and save results"
  • click "Start"

  • The result of the analyis is a file containing all hits above threshold, the filename is "xxxxxxx_cluster.hit", where xxxxxxx is the run name
  • The data structure of the file is described at http://elog.hephy.at/testbeam-SPS08/04
  • The file is located in the same folder as the raw data file (= data)


hitfit:
  • Once apvdaq_analysis_fadc is finished, start a console window and change into the directory /Volumes/Data/eudet/APVDAQ
  • execute ./hitfitrun nnnn, where nnnn is the run number

  • results: file with fitted hits (data structure see http://elog.hephy.at/testbeam-SPS08/04) as well as several plots.
  • file name: xxxxxxx_cluster.hit.fit, the file is located in the subdirectory output.
Entry  Sun Jun 1 23:46:33 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2758 - run2783, 34873, 01.06.2008 23:44:57, 02.06.2008 10:08:46 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

last raw run in RIGHT position
Entry  Mon Jun 2 13:19:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2787, 30000, 02.06.2008 13:15:04, 02.06.2008 14:27:57 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12


Reference run with nominal HV after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 14:32:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2788, 10000, 02.06.2008 14:31:15, 02.06.2008 14:51:55 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
ELOG V3.1.5-fc6679b