| 
| ID | Date | Author | Project | Subject | Run Number | Events | StartTime | EndTime  |  | 49 | Mon Jun  2 23:34:29 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2827 | 10000 | 02.06.2008  23:33:40 | 02.06.2008  23:52:04 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 48 | Mon Jun  2 23:14:58 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2826 | 10000 | 02.06.2008  23:14:19 | 02.06.2008  23:31:29 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 47 | Mon Jun  2 22:55:49 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2825 | 10000 | 02.06.2008  22:55:03 | 02.06.2008  23:12:09 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 46 | Mon Jun  2 22:37:13 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2824 | 10000 | 02.06.2008  22:36:37 | 02.06.2008  22:53:15 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 45 | Mon Jun  2 22:13:17 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2823 | 10000 | 02.06.2008  22:12:44 | 02.06.2008  22:34:49 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 44 | Mon Jun  2 21:54:34 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2822 | 10000 | 02.06.2008  21:53:37 | 02.06.2008  22:10:53 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 43 | Mon Jun  2 21:37:10 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2821 | 10000 | 02.06.2008  21:32:57 | 02.06.2008  21:51:55 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
re-try after several hours of beam down
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 42 | Mon Jun  2 16:01:10 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2792 | 4536 | 02.06.2008  16:00:09 | 02.06.2008  16:19:42 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
stopped after beam problem
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 41 | Mon Jun  2 15:41:20 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2791 | 10000 | 02.06.2008  15:40:20 | 02.06.2008  15:58:16 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 40 | Mon Jun  2 15:21:53 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2790 | 10000 | 02.06.2008  15:20:44 | 02.06.2008  15:38:04 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 38 | Mon Jun  2 14:55:38 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2789 | 10000 | 02.06.2008  14:54:33 | 02.06.2008  15:19:12 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 37 | Mon Jun  2 14:32:40 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2788 | 10000 | 02.06.2008  14:31:15 | 02.06.2008  14:51:55 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 36 | Mon Jun  2 13:19:10 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2787 | 30000 | 02.06.2008  13:15:04 | 02.06.2008  14:27:57 |  | SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Reference run with nominal HV after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  | 35 | Sun Jun  1 23:46:33 2008 | Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2758 - run2783 | 34873 | 01.06.2008  23:44:57 | 02.06.2008  10:08:46 |  | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position |  | 28 | Sun Jun  1 16:06:42 2008 | Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2741 - run2757 | 22000 | 01.06.2008  16:02:56 | 01.06.2008 22:02:34 |  | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |  | 22 | Sun Jun  1 08:06:57 2008 | stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 |  | SiLC beam test - CERN SPS June 2008 8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
 trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
 telescope: raw, new firmware
 
 horizontal position ("target") = -7.5mm
 this is LEFT position
 |  | 33 | Sun Jun  1 23:23:16 2008 | Markus Friedl | SiLC | APVDAQ only (0-sup) | run0004 | 100000 | 01.06.2008  23:21:12 | 01.06.2008  23:41:09 |  | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz) |  | 32 | Sun Jun  1 23:20:10 2008 | Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008  23:16:52 | 01.06.2008  23:19:59 |  | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position |  | 26 | Sun Jun  1 15:08:17 2008 | Markus Friedl | SiLC | APVDAQ only (0-sup) | run0003 | 100000 | 01.06.2008  15:05:51 | 01.06.2008  15:33:58 |  | SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |  | 25 | Sun Jun  1 15:02:51 2008 | Markus Friedl | SiLC | APVDAQ only | ped003 | 10000 | 01.06.2008  15:00:54 | 01.06.2008  15:04:14 |  | SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope
PEDESTAL WITH BEAM (10k) @ MID |  |