  17  
 | 
Sat May 31 17:32:35 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)  | run2717 | 6490 | 31.05.2008  15:57:58 | 31.05.2008  16:09:21 |  SiLC beam test - CERN SPS June 2008 
8 modules, HV=100V, 40MHz, 6 samples 
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real) 
telescope: zero supressed, new firmware 
 
trigger is now correct (9 x 9 mm2 window) 
horizontal position ("target") = 0.0mm |  
| 
  18  
 | 
Sat May 31 17:36:14 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2718 | 100000 | 31.05.2008  16:21:57 | 31.05.2008  21:08:32 |  SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
- long break in the middle due to power outage after thunderstorm
horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position
all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm |  
| 
  20  
 | 
Sat May 31 22:54:29 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2719 | 100000 | 31.05.2008  22:34:38 | 01.06.2008  01:49:30 |  SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
horizontal position ("target") = -2.75mm
this is MID position |  
| 
  21  
 | 
Sun Jun  1 01:56:47 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2720 | 100000 | 01.06.2008  01:51:45 | 01.06.2008  07:48:09 |  SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |  
| 
  23  
 | 
Sun Jun  1 14:36:23 2008 | 
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0002 | 100000 | 01.06.2008  14:25:43 | 01.06.2008  14:54:14 |  SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill  |  
| 
  24  
 | 
Sun Jun  1 14:58:53 2008 | 
Markus Friedl | SiLC | APVDAQ only | ped002 | 10000 | 01.06.2008  14:55:31 | 01.06.2008  14:59:06 |  SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
no telescope
PEDESTAL with BEAM (10k events) @ LEFT  |  
| 
  25  
 | 
Sun Jun  1 15:02:51 2008 | 
Markus Friedl | SiLC | APVDAQ only | ped003 | 10000 | 01.06.2008  15:00:54 | 01.06.2008  15:04:14 |  SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope
PEDESTAL WITH BEAM (10k) @ MID  |  
| 
  26  
 | 
Sun Jun  1 15:08:17 2008 | 
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0003 | 100000 | 01.06.2008  15:05:51 | 01.06.2008  15:33:58 |  SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is MID position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill  |  
| 
  28  
 | 
Sun Jun  1 16:06:42 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2741 - run2757 | 22000 | 01.06.2008  16:02:56 | 01.06.2008 22:02:34 |  SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam...  |  
| 
  30  
 | 
Sun Jun  1 18:23:38 2008 | 
Markus Friedl | SiLC | Very simple tracking | run2719 | 100000 |   |   |  Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).
Results: 
 Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
 Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment  |  
| 
  32  
 | 
Sun Jun  1 23:20:10 2008 | 
Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008  23:16:52 | 01.06.2008  23:19:59 |  SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position  |  
| 
  33  
 | 
Sun Jun  1 23:23:16 2008 | 
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0004 | 100000 | 01.06.2008  23:21:12 | 01.06.2008  23:41:09 |  SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz)  |  
| 
  35  
 | 
Sun Jun  1 23:46:33 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2758 - run2783 | 34873 | 01.06.2008  23:44:57 | 02.06.2008  10:08:46 |  SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position  |  
| 
  36  
 | 
Mon Jun  2 13:19:10 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2787 | 30000 | 02.06.2008  13:15:04 | 02.06.2008  14:27:57 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Reference run with nominal HV after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  37  
 | 
Mon Jun  2 14:32:40 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2788 | 10000 | 02.06.2008  14:31:15 | 02.06.2008  14:51:55 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  38  
 | 
Mon Jun  2 14:55:38 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2789 | 10000 | 02.06.2008  14:54:33 | 02.06.2008  15:19:12 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  40  
 | 
Mon Jun  2 15:21:53 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2790 | 10000 | 02.06.2008  15:20:44 | 02.06.2008  15:38:04 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  41  
 | 
Mon Jun  2 15:41:20 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2791 | 10000 | 02.06.2008  15:40:20 | 02.06.2008  15:58:16 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  42  
 | 
Mon Jun  2 16:01:10 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2792 | 4536 | 02.06.2008  16:00:09 | 02.06.2008  16:19:42 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
stopped after beam problem
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
| 
  43  
 | 
Mon Jun  2 21:37:10 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup)   *** HV-scan *** | run2821 | 10000 | 02.06.2008  21:32:57 | 02.06.2008  21:51:55 |  SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
re-try after several hours of beam down
HV scan after re-arranging the modules:
               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE |  
 
 |