Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-RD50-DESY-Apr2024
testbeam-RD50-DESY-Jul2023
testbeam-RD50-CERN-Oct2022
testbeam-DESY-Oct2017
testbeam-DESY-April2017
testbeam-SPS2015
testbeam-SPS2014
testbeam-DESY14
testbeam-SPS12
testbeam-SPS11
testbeam-SPS10
testbeam-SPS09
testbeam-SPS08
LP-TPC
HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Project --
SiLC
BELLE
other
65 Entries
Goto page 1,
2
,
3
,
4
Next
All
ID
Date
Author
Project
Subject
Run Number
Events
StartTime
EndTime
Text
1
Tue May 6 13:51:43 2008
Thomas Bergauer
other
Equipment list
[B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
2
Wed May 7 10:43:09 2008
Thomas Bergauer
SiLC
Documentation: twiki, Stephans Hardware Drawings,....
DUT, APVDAQ Documentation
CERN TWiki:
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
3
Wed May 7 16:28:23 2008
stephan hänsel
SiLC
Photos
Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview
4
Fri May 9 11:46:36 2008
Markus Friedl
SiLC
Data file format
(work in progress)
APVDAQ Data Analysis
====================
5
Fri May 9 15:29:28 2008
Thomas Bergauer
SiLC
Sensor Layout
6
Wed May 14 09:21:39 2008
stephan hänsel
SiLC
capacity measurements - HPK-ILC-TS-6687-24
ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
7
Wed May 14 16:15:30 2008
Markus Friedl
BELLE
Micron DDD5 Photos
This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
8
Mon May 19 15:14:40 2008
Markus Friedl
other
Tentative Beam Test Schedule
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
9
Mon May 19 15:21:49 2008
Markus Friedl
other
CERN SPS page 1
SPS Status
SPS
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
10
Fri May 23 15:17:49 2008
Markus Friedl
SiLC
Module/chip/strip/zone numbering scheme
(work in progress)
The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers
11
Mon May 26 15:38:53 2008
Markus Friedl
SiLC
How to run APVDAQ
Power-on Procedure
==================
12
Fri May 30 10:36:18 2008
Marko Dragicevic
other
Important Information/Contact
[B]IPs[/B]
Linksys Router
[LIST]
15
Sat May 31 13:34:28 2008
Thomas Bergauer
how to copy data from lab2pc to eudetmac
rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
19
Sat May 31 18:33:50 2008
Thomas Bergauer
other
beam profile
[SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD
(P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
29
Sun Jun 1 17:01:12 2008
Thomas Bergauer
SiLC
path do data
[SIZE=4]The data of all runs are stored on
eudetmac001.cern.ch:[/SIZE]
30
Sun Jun 1 18:23:38 2008
Markus Friedl
SiLC
Very simple tracking
run2719
100000
Very simple alignment (manual linear x direction
shifting only, no rotation, assuming equal
z spacing) and tracking.
31
Sun Jun 1 20:13:37 2008
Eudet Telescope
SiLC
BZIP2 compressed APVDAQ data
[b]Processed APVDAQ data_cluster - in tar.bzip2
format:[/b]
34
Sun Jun 1 23:36:21 2008
Christian Irmler
SiLC
HowTo analyse data
The analysis consists of two stages:
[LIST]
[*] The first is zero supression an cluster
59
Tue Jun 3 12:41:22 2008
Eudet Telescope
useful eudaq software commands
(work in progress)
[b]to show information about a run (number
of events, start and end timestamp,....:[/b]
./TestReader.exe -b -e 2828
67
Wed Jun 4 15:41:04 2008
Thomas Bergauer
end.
testbeam is over. DUTs and APVDAQ have been
dismounted and will be shipped back to Vienna.
EUDET telescope is still in H6B and taking
Goto page 1,
2
,
3
,
4
Next
All
ELOG V3.1.5-fc6679b