Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm |
Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
terminated after 51803 events due to beam drop out @ 22.00h |
Tue Jun 3 18:17:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2838, 478159, 03.06.2008 18:38:07, 04.06.2008 10:41:51
|
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes. |
Mon Jun 2 16:01:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2792, 4536, 02.06.2008 16:00:09, 02.06.2008 16:19:42
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
stopped after beam problem
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
Tue Jun 3 09:12:42 2008, Markus Friedl, BELLE, APVDAQ only, run0005, 45020, 03.06.2008 09:11:30, 03.06.2008 09:24:42
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE
stuck after 45020 events with the repeated message
***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated. |
Tue Jun 3 11:03:27 2008, Thomas Bergauer, , telescope alignment run, run2830, 3897, 2008-06-03 10:52:16.783, 2008-06-03 10:58:52.790
|
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A) |
Sun Jun 1 23:46:33 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2758 - run2783, 34873, 01.06.2008 23:44:57, 02.06.2008 10:08:46
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position |
Mon Jun 2 13:19:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2787, 30000, 02.06.2008 13:15:04, 02.06.2008 14:27:57
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Reference run with nominal HV after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
Tue Jun 3 09:27:27 2008, Markus Friedl, BELLE, APVDAQ only, run0006, 23929, 03.06.2008 09:26:16, 03.06.2008 09:34:22
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY
STUCK again after some time - now adding veto clear in error handling routine |
Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |
Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm |
Tue Jun 3 16:53:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2837, 20000, 03.06.2008 16:49:40, 03.06.2008 17:26:49
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58
|
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf |
Tue Jun 3 02:38:21 2008, Markus Friedl, BELLE, APVDAQ + telescope (0-sup), run2829, 105000, 03.06.2008 02:29:51, 03.06.2008 09:08:58
|
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules |
Tue Jun 3 09:57:17 2008, Markus Friedl, BELLE, APVDAQ only, run0007, 105000, 03.06.2008 09:40:18, 03.06.2008 10:12:48
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY after software bugfix - apparently works |
Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
- long break in the middle due to power outage after thunderstorm
horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position
all 3 positions are:
RIGHT: +2.00 mm <--- this run
MID: -2.75 mm
LEFT: -7.50 mm |
Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
horizontal position ("target") = -2.75mm
this is MID position |
Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |
|