Sun Jun 1 23:36:21 2008, Christian Irmler, SiLC, HowTo analyse data, , , ,
|
The analysis consists of two stages:
[LIST]
[*] The first is zero supression an cluster finding done with "apvdaq_analysis_fadc" (Labwindows/CVI application)
|
Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58
|
Telescope Pedestal Run
no DUTs!
no Beam!
|
Sun Jun 1 20:13:37 2008, Eudet Telescope, SiLC, BZIP2 compressed APVDAQ data, , , ,
|
[b]Processed APVDAQ data_cluster - in tar.bzip2 format:[/b]
- on machine: eudetmac001.cern.ch
|
Tue Jun 3 12:41:22 2008, Eudet Telescope, , useful eudaq software commands, (work in progress), , ,
|
[b]to show information about a run (number of events, start and end timestamp,....:[/b]
./TestReader.exe -b -e 2828 |
Fri May 30 10:36:18 2008, Marko Dragicevic, other, Important Information/Contact, , , ,
|
[B]IPs[/B]
Linksys Router
[LIST]
|
Fri May 9 11:46:36 2008, Markus Friedl, SiLC, Data file format, (work in progress), , ,
|
APVDAQ Data Analysis
====================
|
Wed May 14 16:15:30 2008, Markus Friedl, BELLE, Micron DDD5 Photos, , , ,
|
This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.
The p-side flex hybrid sits at the edge of the sensor, while the n-side flex hybrid is located on top of about
|
Mon May 19 15:14:40 2008, Markus Friedl, other, Tentative Beam Test Schedule, , , ,
|
Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
|
Mon May 19 15:21:49 2008, Markus Friedl, other, CERN SPS page 1, , , ,
|
SPS Status
SPS Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
Manual - http://jwenning.web.cern.ch/jwenning/documents/SPS/Operation/Page-1%20description.htm
Linac, |
Fri May 23 15:17:49 2008, Markus Friedl, SiLC, Module/chip/strip/zone numbering scheme, (work in progress), , ,
|
The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
The spacing between each of the 8 layers is 20mm. Seen with the beam, the fourth layer is exactly centered
between the telescope legs. This means that the stack as a whole is not exactly centered, as there is no
|
Mon May 26 15:38:53 2008, Markus Friedl, SiLC, How to run APVDAQ, , , ,
|
Power-on Procedure
==================
|
Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
|
Sun Jun 1 01:56:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2720, 100000, 01.06.2008 01:51:45, 01.06.2008 07:48:09
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
|
Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
|
Sun Jun 1 15:02:51 2008, Markus Friedl, SiLC, APVDAQ only, ped003, 10000, 01.06.2008 15:00:54, 01.06.2008 15:04:14
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
|
Sun Jun 1 15:08:17 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0003, 100000, 01.06.2008 15:05:51, 01.06.2008 15:33:58
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
|
|