Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsdown StartTime EndTime
  17   Sat May 31 17:32:35 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) run2717649031.05.2008 15:57:5831.05.2008 16:09:21
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm
  14   Fri May 30 19:42:13 2008 stephan hänselSiLCAPVDAQ onlyrun00015180330.05.2008 19:38:0430.05.2008 22:54:59
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope

terminated after 51803 events due to beam drop out @ 22.00h
  66   Tue Jun 3 18:17:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run283847815903.06.2008 18:38:0704.06.2008 10:41:51
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes.
  42   Mon Jun 2 16:01:10 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run2792453602.06.2008 16:00:0902.06.2008 16:19:42
SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

stopped after beam problem


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  53   Tue Jun 3 09:12:42 2008 Markus FriedlBELLEAPVDAQ onlyrun00054502003.06.2008 09:11:3003.06.2008 09:24:42
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE


stuck after 45020 events with the repeated message  
 ***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated.
  57   Tue Jun 3 11:03:27 2008 Thomas Bergauer telescope alignment runrun283038972008-06-03 10:52:16.7832008-06-03 10:58:52.790
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A)
  35   Sun Jun 1 23:46:33 2008 Markus FriedlSiLCAPVDAQ + telescope (raw)run2758 - run27833487301.06.2008 23:44:5702.06.2008 10:08:46
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

last raw run in RIGHT position
  36   Mon Jun 2 13:19:10 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** HV-scan ***run27873000002.06.2008 13:15:0402.06.2008 14:27:57
SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12


Reference run with nominal HV after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
  54   Tue Jun 3 09:27:27 2008 Markus FriedlBELLEAPVDAQ onlyrun00062392903.06.2008 09:26:1603.06.2008 09:34:22
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY

STUCK again after some time - now adding veto clear in error handling routine
  22   Sun Jun 1 08:06:57 2008 stephan hänselSiLCAPVDAQ + telescope (raw)run2721-27372200001.06.2008 - 08:01:5301.06.2008 - 14:19:13
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
  28   Sun Jun 1 16:06:42 2008 Markus FriedlSiLCAPVDAQ + telescope (raw)run2741 - run27572200001.06.2008 16:02:5601.06.2008 22:02:34
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

right from the start: no beam...
  16   Sat May 31 17:29:40 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run27162000031.05.2008 14:59:2631.05.2008 15:56:23
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm
  65   Tue Jun 3 16:53:20 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) *** angle-scan ***run28372000003.06.2008 16:49:4003.06.2008 17:26:49
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
  27   Sun Jun 1 15:52:03 2008 Eudet TelescopeSiLCTelescope Pedestal Runrun273812471.6.2008. 15:501.6.2008. 15:58
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf
  52   Tue Jun 3 02:38:21 2008 Markus FriedlBELLEAPVDAQ + telescope (0-sup)run282910500003.06.2008 02:29:5103.06.2008 09:08:58
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
  55   Tue Jun 3 09:57:17 2008 Markus FriedlBELLEAPVDAQ onlyrun000710500003.06.2008 09:40:1803.06.2008 10:12:48
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY after software bugfix - apparently works
  18   Sat May 31 17:36:14 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271810000031.05.2008 16:21:5731.05.2008 21:08:32
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

- long break in the middle due to power outage after thunderstorm

horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position

all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm
  20   Sat May 31 22:54:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271910000031.05.2008 22:34:3801.06.2008 01:49:30
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

horizontal position ("target") = -2.75mm
this is MID position
  21   Sun Jun 1 01:56:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run272010000001.06.2008 01:51:4501.06.2008 07:48:09
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

horizontal position ("target") = -7.5mm
this is LEFT position
  23   Sun Jun 1 14:36:23 2008 Markus FriedlSiLCAPVDAQ only (0-sup)run000210000001.06.2008 14:25:4301.06.2008 14:54:14
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill
ELOG V3.1.5-fc6679b