Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 8 of 10  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Datadown t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  115   Sun Jun 22 02:18:00 2025 Julia Müllner124.4 MeV mouse41TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood2:172:258   

axis 1: 13

axis 2: 23

  116   Sun Jun 22 02:25:33 2025 Julia Müllner124.4 MeV mouse42TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood2:262:359   

axis 1: 5

axis 2: 23

  117   Sun Jun 22 02:35:55 2025 Julia Müllner124.4 MeV mouse43TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood2:362:459   

axis 1: 5

axis 2: 20

  118   Sun Jun 22 02:43:48 2025 Julia Müllner124.4 MeV mouse44TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood2:462:559   

axis 1: 5

axis 2: 17

  119   Sun Jun 22 02:55:26 2025 Julia Müllner124.4 MeV mouse45TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood2:553:1116   

axis 1: 5

axis 2: 14

beam was interrupted for a few minutes

  120   Sun Jun 22 03:11:40 2025 Julia Müllner124.4 MeV mouse46TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood3:113:2110   

axis 1: 5

axis 2: 11

  121   Sun Jun 22 03:21:57 2025 Julia Müllner124.4 MeV mouse47TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood3:213:3110   

axis 1: 5

axis 2: 8

  122   Sun Jun 22 03:32:06 2025 Julia Müllner124.4 MeV mouse48TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood3:313:4110   

axis 1: 5

axis 2: 5

  123   Sun Jun 22 03:41:19 2025 Julia Müllner124.4 MeV mouse49TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood03:4103:5110   

axis 1: 5

axis 2: 2

  124   Sun Jun 22 03:52:09 2025 Julia Müllner124.4 MeV mouse50TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood3:524:0210   

axis 1: 5

axis 2: -1

  125   Sun Jun 22 04:03:00 2025 Julia Müllner124.4 MeV mouse51TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:034:1310   

axis 1: 5

axis 2: -4

  126   Sun Jun 22 04:14:02 2025 Julia Müllner124.4 MeV mouse52TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:134:2310   

axis 1: 1

axis 2: -4

  127   Sun Jun 22 04:23:59 2025 Julia Müllner124.4 MeV mouse53TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:244:339   

axis1: 1

axis 2: -1

  128   Sun Jun 22 04:34:00 2025 Julia Müllner124.4 MeV mouse54TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:344:439   

axis 1: 1

axis 2: 2

  129   Sun Jun 22 04:44:05 2025 Julia Müllner124.4 MeV mouse55TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood4:444:539   

axis 1: 1

axis 2: 5

  131   Sun Jun 22 05:03:52 2025 Julia Müllner124.4 MeV mouse57TOF-Cal GSI124.4 MeV/uLow Flux HighHeliumGood5:065:1610   

axis 1: -24

axis 2: 2

still upside down

  132   Sun Jun 22 05:16:32 2025 Julia Müllner402 MeV mouse58TOF-Cal GSI402MeV/uLow Flux HighCarbonGood5:296:0031   

axis 1: 5

axis 2: 2

degrader 10, mouse is still inside

  27   Fri Mar 14 23:55:03 2025 elog-producer1st tests with beam210TJ-Monopix2800 MeVLow Flux Very LowProtonCrap14.03.2025 23:37:0214.03.2025 23:55:2918HVNone 
automatic log for run 210
Comment:
  46   Sat Mar 15 04:11:28 2025 elog-producerenergy scans231TJ-Monopix283 MeVLow Flux Very LowProtonCrap15.03.2025 04:00:2015.03.2025 04:11:5411HVNone 
automatic log for run 231
Comment:
  82   Sat Jun 21 18:22:28 2025 Julia Müllner73.2 MeV systemtest 8TOF-Cal GSI73.2 MeV/uLow Flux HighHeliumCrap19:1019:2111   

new callibration was done, dimanond detector connected to readout

Threshold = 4000

thresholds were too low -> run was canceled

ELOG V3.1.5-fc6679b