Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025  Not logged in ELOG logo
Message ID: 66     Entry time: Sat Mar 15 13:15:25 2025
Author: RD50 Generic User 
Subject: Slab Measurement 205MeV 
Run Number:
DUT: Sandwich-iCT setup(GSI)+RaMon 
Beam Energy: 205.2 MeV/u 
Rate Setting: Low Flux Medium 
Particle Type: Helium 
Data: Good 
t-Start: 13:27 
t-Stop: 14:49 
Duration_min: 82 
Frontend:  
Phantom:  
Phantom thickness:  

RaMon Rate 1.3 MHz

Comments:

We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed.

ELOG V3.1.5-fc6679b