Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 19  Not logged in ELOG logo
Entry  Sat Dec 13 10:18:41 2025, elog_producer, Alignment, 3, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 09:41:19, 13.12.2025 10:19:06, 37, Normal, None,  ramon.conf
automatic log for run 3
Comment:
alignment mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 10:57:30 2025, elog_producer, Alignment, 4, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:27:49, 13.12.2025 10:57:55, 30, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 4
Comment:
mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
beam spot is centered
Entry  Sat Dec 13 11:14:38 2025, elog_producer, mixed beam, 5, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:59:00, 13.12.2025 11:15:03, 16, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 5
Comment:
10% He
310 mki
amplitude modulation lf12
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:26:46 2025, elog_producer, mixed beam, 6, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:15:29, 13.12.2025 11:27:11, 11, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 6
Comment:
20% He
300 mki
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:29:15 2025, elog_producer, mixed beam, 7, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:27:20, 13.12.2025 11:29:40, 2, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 7
Comment:
20% He
290 mki
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:32:59 2025, elog_producer, mixed beam, 8, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:30:15, 13.12.2025 11:33:24, 3, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 8
Comment:
0% He
430 mki
amplituden modulation lf12
trigger window: 640ns pre and 85ns post
TDC4 faild, powercycle everything and restart network connections
Entry  Sat Dec 13 12:26:16 2025, elog_producer, mixed beam, 9, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:47:19, 13.12.2025 12:26:41, 39, Normal, Mixed Beam QA phantom (ICs), 17cm ramon.conf
automatic log for run 9
Comment:
xx% He
mixed beam QA test run
Entry  Sat Dec 13 14:48:42 2025, elog_producer, energy calibration, 18, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Crap, 13.12.2025 14:43:14, 13.12.2025 14:49:07, 5, Normal, RW3 Plate,  ramon.conf
automatic log for run 18
Comment:
2x ionization chambers
detector 4 failed (problem with HV)
Entry  Sat Dec 13 16:00:08 2025, elog_producer, energy calibration, 19, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 15:02:15, 13.12.2025 16:00:34, 58, Normal, RW3 Plate, 11cm ramon.conf
automatic log for run 19
Comment:
2x ionization chambers
new threshold scan
1 spill 400MeV
downtime
Entry  Sat Dec 13 16:26:02 2025, elog_producer, energy calibration, 20, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:13:10, 13.12.2025 16:26:28, 13, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 20
Comment:
2x ionization chambers
start only He without dogma
Starts with only C (16:24)
Entry  Sat Dec 13 16:54:13 2025, elog_producer, energy calibration, 21, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:27:34, 13.12.2025 16:54:39, 27, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 21
Comment:
2x ionization chambers
same C setting now with He
identifier a
powercycle TDCs (16:43)
Entry  Sat Dec 13 17:26:16 2025, elog_producer, energy calibration, 22, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:57:59, 13.12.2025 17:26:41, 28, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 22
Comment:
2x ionization chambers
identifier b
Entry  Sat Dec 13 18:01:55 2025, elog_producer, energy calibration, 23, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 17:43:07, 13.12.2025 18:02:21, 19, Normal, RW3 Plate, 12cm ramon.conf
automatic log for run 23
Comment:
2x ionization chambers
identifier c
Entry  Sat Dec 13 18:22:46 2025, elog_producer, energy calibration, 24, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 18:04:25, 13.12.2025 18:23:11, 18, Normal, RW3 Plate, 12cm ramon.conf
automatic log for run 24
Comment:
2x ionization chambers
identifier d
Entry  Sat Dec 13 18:47:46 2025, elog_producer, energy calibration, 25, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 18:28:22, 13.12.2025 18:48:12, 19, Normal, RW3 Plate, 12cm+2mm ramon.conf
automatic log for run 25
Comment:
2x ionization chambers
identifier e
mki: 310
Entry  Sat Dec 13 19:11:30 2025, elog_producer, energy calibration, 26, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 18:50:21, 13.12.2025 19:11:56, 21, Normal, RW3 Plate, 12cm+2mm ramon.conf
automatic log for run 26
Comment:
2x ionization chambers
identifier f
mki: 290
Entry  Sat Dec 13 19:35:03 2025, elog_producer, energy calibration, 27, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 19:18:33, 13.12.2025 19:35:29, 16, Normal, RW3 Plate, 12cm+3mm ramon.conf
automatic log for run 27
Comment:
2x ionization chambers
identifier g
mki: 290
Entry  Sat Dec 13 19:47:31 2025, elog_producer, energy calibration, 28, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 19:42:00, 13.12.2025 19:47:57, 5, Normal, RW3 Plate, 12cm+3mm ramon.conf
automatic log for run 28
Comment:
2x ionization chambers
identifier h
mki: 310
(ramon start delayed Frown)
Entry  Sat Dec 13 20:04:41 2025, elog_producer, energy calibration, 29, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 19:49:01, 13.12.2025 20:05:07, 16, Normal, RW3 Plate, 12cm+3mm ramon.conf
automatic log for run 29
Comment:
2x ionization chambers
C only
identifier i
mki: 430
Entry  Sat Dec 13 20:24:58 2025, elog_producer, energy calibration, 30, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 20:10:43, 13.12.2025 20:25:24, 14, Normal, RW3 Plate, 12cm+3mm ramon.conf
automatic log for run 30
Comment:
2x ionization chambers
0.5mm Kapton
identifier j
mki: 310
ELOG V3.1.5-fc6679b