ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
156
|
Sat Dec 14 13:07:15 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 17 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 08:46 | 09:42 | 56 | | | |
before run, setups had to be aligned (first slab in slabholder was put in isocentre. However, in this run, no slab was used). Room was closed at 08:10
Beam->Nozzle-> Slabholder->TOF-CAL (TRB)-> DOGMA Setup(Diamond+LGADs)-> RaMon
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
measured 400kHz with Ramon and only 100kHz with LGADs (third LGAD) and 60kHz accepted trrigger rate
beam was shifted vertically by x? cm? (need to lookup again). So TRB setup was shifted with motors such that the He beam was hitting the centre of the LGADs |
157
|
Sat Dec 14 13:16:33 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration +Alignment of DOGMA setup | 18 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 09:42 | 09:48 | 6 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
DOGMA setup had to be shifted manually to align it with the beam |
158
|
Sat Dec 14 13:26:29 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 19 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 177.8 MeV/u | Low Flux Medium | Helium | Good | 10:08 | 10:25 | 17 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
750kHz with Ramon and only 160kHz with TRB, 44ps single channel res preacalib |
159
|
Sat Dec 14 13:28:57 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 20 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux Medium | Helium | Good | 10:33 | 10:38 | 5 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
300kHz with Ramon and only 40kHz with TRB--> decision to go to low flux high was made |
160
|
Sat Dec 14 13:31:49 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 21 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 10:41 | 10:56 | 15 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
3.5MHz with Ramon and only 600kHz with TRB-52ps single channel res prae calib |
161
|
Sat Dec 14 13:34:18 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 22 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 10:58 | 11:23 | 25 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
3MHz with Ramon and only 300kHz with TRB-44ps single channel res prae calib |
162
|
Sat Dec 14 13:35:59 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 23 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 124.4 MeV/u | Low Flux High | Helium | Good | 11:24 | 11:37 | 13 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
5MHz with Ramon and only 500kHz TRB |
163
|
Sat Dec 14 13:37:26 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 24 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 73.2 MeV/u | Low Flux High | Helium | Good | 11:42 | 12:00 | 18 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
2MHz with Ramon and only 200kHz TRB |
164
|
Sat Dec 14 13:39:15 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 25 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 12:05 | 12:23 | 18 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
380 kHz with Ramon and only 180kHz TRB, 42ps single channel res prae calib |
165
|
Sat Dec 14 13:40:47 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 26 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 12:35 | 12:49 | 14 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 10000 (changed threshold)
Diamond: 500mA, threshold 50 |
166
|
Sat Dec 14 13:42:52 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 27 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 12:52 | 13:16 | 24 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 50 |
167
|
Sat Dec 14 13:45:34 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 28 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 13:20 | 13:32 | 2 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 offset |
168
|
Sat Dec 14 13:46:11 2024 |
Felix Ulrich-Pur | WET measurement slabs | 29 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 13:34 | 14:03 | 29 | | Plastic Water Slabs | 1cm |
1cm Plastic Water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 offset
DOGMA lost DiRICH after restarting Wave (happened several times) |
169
|
Sat Dec 14 13:49:20 2024 |
Felix Ulrich-Pur | WET measurement slabs | 30 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 14:02 | 14:45 | 43 | | Plastic Water Slabs | 1cm |
1cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 500 kHz TRB |
170
|
Sat Dec 14 13:56:16 2024 |
Felix Ulrich-Pur | WET measurement slabs | 31 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 14:48 | 15:06 | 18 | | Plastic Water Slabs | 2cm |
2cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 1.4MHz TRB |
171
|
Sat Dec 14 15:09:34 2024 |
Felix Ulrich-Pur | WET measurement slabs | 32 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 15:06 | 15:19 | 13 | | Plastic Water Slabs | 2cm |
2cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
|
172
|
Sat Dec 14 15:10:35 2024 |
Felix Ulrich-Pur | WET measurement slabs | 33 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:24 | 15:36 | 12 | | Plastic Water Slabs | 3cm |
3cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3-4MHz Ramon 600 kHz TRB |
173
|
Sat Dec 14 15:12:01 2024 |
Felix Ulrich-Pur | WET measurement slabs | 34 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 15:37 | 15:48 | 11 | | Plastic Water Slabs | 3cm |
3cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 300 kHz TRB |
174
|
Sat Dec 14 15:12:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 35 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:53 | 16:10 | 17 | | Plastic Water Slabs | 4cm |
4cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 600 kHz TRB |
175
|
Sat Dec 14 15:15:04 2024 |
Felix Ulrich-Pur | WET measurement slabs | 36 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 16:11 | 16:23 | 12 | | Plastic Water Slabs | 4cm |
4cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 300 kHz TRB |