Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024  Not logged in ELOG logo
Message ID: 173     Entry time: Sat Dec 14 15:12:01 2024
Author: Felix Ulrich-Pur 
Subject: WET measurement slabs 
Run Number: 34 
DUT: TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon 
Beam Energy: 147.2 MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Good 
t-Start: 15:37 
t-Stop: 15:48 
Duration_min: 11 
Frontend:  
Phantom: Plastic Water Slabs 
Phantom thickness: 3cm 

3cm plastic water

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

Diamond: 900mA, threshold 1000 offset

3MHz Ramon 300 kHz TRB

ELOG V3.1.5-fc6679b