Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 5 of 5  Not logged in ELOG logo
Entry  Sat Jan 11 20:56:29 2014, Markus Friedl, AIDA, run, run053, 100k, 11.01.2014 20:55:29, 11.01.2014 22:25:43, Good 
HV=140V  I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
Entry  Wed Jan 29 12:02:52 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2 Bias Scan, HW_Run_Infineon_Stack2_BiasScan_001, 100k, 28.01.2014 16:30, 28.01.2014 16:50, Good 
HV at 0V; I at app. 5nA 3GeV, Single mode
 
Entry  Wed Jan 29 21:57:55 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2 Bias Scan, HW_Run_Infineon_Stack2_BiasScan_010, 100k, 29.01.2014 13:20, 29.01.2014 13:35, Good 
HV at 260V; I at app. 7.6µA 3GeV, Single mode
 
Entry  Wed Jan 8 22:19:11 2014, Markus Friedl, AIDA, run, run037, 1.2M, 08.01.2014 22:18:30, 09.01.2014 10:08:14, Good 
HV=100V  I=4.4uA
centered position
5GeV beam, single sample
Entry  Sat Jan 25 18:24:03 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_001, 1.05 M, 25.01.2014 10:30, 25.01.2014 15:40, Unknown 
HV at 300V; I at app. 11µA 4GeV, Single mode
Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)
-> HV connection will be checked at next opportunity to enter area.
Entry  Fri Jan 24 11:03:14 2014, Wolfgang Treberspurg, AIDA, AIDA, HW_AIDA002, 0, 24.01.2014 10:02, , Crap 
TuxDaq crashed
Entry  Mon Jan 6 19:10:36 2014, Thomas Bergauer, common, Beam Momentum 3GeV/c, run001 to run012, , , , Unknown IMG_1517.jpgIMG_1516.jpg
We have set the beam momentum to 3 GeV 
Entry  Tue Jan 7 02:17:14 2014, Thomas Bergauer, , beam momentum 6GeV/c, run013, , , , Unknown 
 
Entry  Tue Jan 7 09:33:51 2014, Thomas Bergauer, common, beam momentum back to 3Gev/c, run014 and later ones, , , , Unknown 
 
Entry  Tue Jan 7 14:51:45 2014, Thomas Bergauer, Belle SVD, TLU control, , , , , Unknown 
1. ssh bastion
2. ssh belle-control
3. ssh telescope-admin@tb-aconite
Entry  Thu Jan 9 11:02:14 2014, Markus Friedl, AIDA, info, , , , , Unknown 
Created bad strip masks for the AIDA config files
Entry  Thu Jan 9 14:47:21 2014, Thomas Bergauer, common, position of DESY Table, , , , , Unknown 
BEAM mode:

    height (z): -346 (initially: -357)
    horizontal (x): -255 

OFF BEAM mode (Parkposition):

    height (z): +37
    horizontal (x): -255 

 
Entry  Fri Jan 10 11:02:31 2014, Markus Friedl, Belle SVD, Power supply, , , 10.01.2014 11:00:00, , Unknown KenWood100114.png
 
Entry  Mon Jan 13 12:02:40 2014, Markus Friedl, common, Kontakt, , , , , Unknown 
Richard Thalmeier   Tel. 4801
Hao Yin   
Entry  Sun Jan 19 18:01:46 2014, Christian Irmler, common, AIDA setup operated with TuxDAQ, , , , , Unknown 
New SIS driver version sis1100-2.13-3 installed on DAQPC. 
To install the driver call as root:
cd /lib/modules/2.6.18-371.3.1.el5/extra
Entry  Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good 
Exchanged AIDA stack with modified Infineon Stack 
Configuration: 
Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3)
Entry  Wed Jan 29 22:08:48 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2 Bias Scan, , , 29.01.2014 22:00, 29.01.2014 22:00, Good 
All Infineon Stack 2 runs have been taken at table position: 1.089030, -12.800610
 
ELOG V3.1.5-fc6679b