ID Date Author Projectdown Subject Run Number Events StartTime EndTime Data
  25   Tue Jan 7 11:52:27 2014 Markus FriedlInfineonrunrun019650k07.01.2014 11:47:2407.01.2014 13:15:21Good

HV=300V  I=9.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single sample run

Beam energy = 3 GeV

  26   Tue Jan 7 13:20:48 2014 Markus FriedlInfineonrunrun020300k07.01.2014 13:18:5207.01.2014 14:35:49Good

HV=300V  I=8.5uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

multi6 with same settings as run019 (htr+3)

Beam energy = 3 GeV

  27   Tue Jan 7 14:47:38 2014 Markus FriedlInfineonrunrun021200k07.01.2014 14:46:0807.01.2014 15:13:23Good

HV=100V  I=7.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  29   Tue Jan 7 15:16:11 2014 Markus FriedlInfineonrunrun022200k07.01.2014 15:15:0907.01.2014 15:42:17Good

HV=150V  I=7.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  30   Tue Jan 7 15:54:22 2014 Markus FriedlInfineonrunrun023200k07.01.2014 15:53:0607.01.2014 16:25:26Good

HV=200V  I=8.0uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  31   Tue Jan 7 16:36:49 2014 Markus FriedlInfineonrunrun024200k07.01.2014 16:35:4407.01.2014 17:03:10Good

HV=210V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  32   Tue Jan 7 17:09:56 2014 Markus FriedlInfineonrunrun025200k07.01.2014 17:08:5407.01.2014 17:36:12Good

HV=220V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  33   Tue Jan 7 17:39:20 2014 Markus FriedlInfineonrunrun026200k07.01.2014 17:38:0107.01.2014 18:05:11Good

HV=230V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  34   Tue Jan 7 18:11:52 2014 Markus FriedlInfineonrunrun027200k07.01.2014 18:10:4507.01.2014 18:37:42Good

HV=240V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  35   Tue Jan 7 18:41:55 2014 Markus FriedlInfineonrunrun028200k07.01.2014 18:40:4007.01.2014 19:07:32Good

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  36   Tue Jan 7 19:12:07 2014 Markus FriedlInfineonrunrun029200k07.01.2014 19:11:0507.01.2014 19:38:00Good

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  37   Tue Jan 7 19:44:45 2014 Markus FriedlInfineonrunrun030200k07.01.2014 19:43:3507.01.2014 20:11:03Good

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  38   Tue Jan 7 20:26:50 2014 Markus FriedlInfineonrunrun031200k07.01.2014 20:25:3207.01.2014 20:58:47Good

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  39   Tue Jan 7 21:02:58 2014 Markus FriedlInfineonrunrun032200k07.01.2014 21:01:4207.01.2014 21:29:03Good

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  40   Tue Jan 7 21:34:41 2014 Markus FriedlInfineonrunrun0334.117.024 (4M)07.01.2014 21:33:1208.01.2014 08:52:37Good

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

  73   Fri Jan 24 18:02:46 2014 Wolfgang TreberspurgInfineonNew Infineon Stack    Good

Exchanged AIDA stack with modified Infineon Stack

Configuration:

Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0)  --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---

  74   Sat Jan 25 18:24:03 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0011.05 M25.01.2014 10:3025.01.2014 15:40Unknown

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

  75   Sat Jan 25 18:28:38 2014 Wolfgang TreberspurgInfineonCalibration run Infineon Stack 2Calibration_Run_Infineon_Stack2_0018290025.01.2014 10:1525.01.2014 10:25Unknown

HV 300V, I ca. 11µA single mode

  76   Sat Jan 25 18:46:32 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_001340k25.01.2014 16:3025.01.2014 18:40Unknown

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

  77   Sat Jan 25 21:14:46 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_002230k25.01.2014 19:0025.01.2014 21:15Good

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93