Sun Jan 26 19:12:42 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_002, 4 M, 25.01.2014 22:30, 26.01.2014 15:15, Good
|
HV at 300V; I at app. 11µA 4GeV, Single mode
|
Sat Jan 25 21:14:46 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_002, 230k, 25.01.2014 19:00, 25.01.2014 21:15, Good
|
HV 300V, I 10µA
Beam Energy 4GeV
Latency changed to 93 |
Sat Jan 25 18:46:32 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_001, 340k, 25.01.2014 16:30, 25.01.2014 18:40, Unknown
|
HV 300V, I 10µA
Beam Energy changed during the run between 2GeV - 5GeV - 4GeV
Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93 |
Sat Jan 25 18:28:38 2014, Wolfgang Treberspurg, Infineon, Calibration run Infineon Stack 2, Calibration_Run_Infineon_Stack2_001, 82900, 25.01.2014 10:15, 25.01.2014 10:25, Unknown
|
HV 300V, I ca. 11µA single mode |
Sat Jan 25 18:24:03 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_001, 1.05 M, 25.01.2014 10:30, 25.01.2014 15:40, Unknown
|
HV at 300V; I at app. 11µA 4GeV, Single mode
Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)
-> HV connection will be checked at next opportunity to enter area. |
Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good
|
Exchanged AIDA stack with modified Infineon Stack
Configuration:
Beam Infineon_TB_2014_Baby1(P0) --- Inifineon_TB_2014_Baby2(P1) ||| Infineon_TB_2012_Baby2(P2) --- Infineon_TB_2012_Baby1(P3) |
Fri Jan 24 11:23:15 2014, Hao Yin, , AIDA, HW_AIDA003, 76356, 24.02.2014 10:30, 24.02.2014 11:22, Unknown
|
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples |
Fri Jan 24 11:03:14 2014, Wolfgang Treberspurg, AIDA, AIDA, HW_AIDA002, 0, 24.01.2014 10:02, , Crap
|
TuxDaq crashed |
Fri Jan 24 00:21:16 2014, Hao Yin, , AIDA, HW_AIDA001, 40k, 24.02.2014 00:18, , Unknown
|
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples |
Thu Jan 23 22:47:49 2014, Hao Yin, , AIDA, CalibrationRun001, 83800, 23.01.2014 13:35:55, 23.01.2014 02:08:15, Good
|
taken with tuxdaq...
HV=75V I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ? |
Sun Jan 19 18:01:46 2014, Christian Irmler, common, AIDA setup operated with TuxDAQ, , , , , Unknown
|
New SIS driver version sis1100-2.13-3 installed on DAQPC.
To install the driver call as root:
cd /lib/modules/2.6.18-371.3.1.el5/extra |
Mon Jan 13 12:02:40 2014, Markus Friedl, common, Kontakt, , , , , Unknown
|
Richard Thalmeier Tel. 4801
Hao Yin |
Mon Jan 13 01:58:14 2014, Markus Friedl, AIDA, run, run057, 900k, 13.01.2014 01:56:26, 13.01.2014 10:48:22, Good
|
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample |
Sun Jan 12 18:04:18 2014, Markus Friedl, AIDA, run, run056, 510k, 12.01.2014 17:59:57, 13.01.2014 01:47:50, Good
|
HV=100V I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples |
Sun Jan 12 10:36:37 2014, Markus Friedl, AIDA, run, run055, 310913, 12.01.2014 10:34:44, 12.01.2014 15:42:47, Good
|
HV=100V I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples |
Sat Jan 11 22:32:19 2014, Markus Friedl, AIDA, run, run054, 800k, 11.01.2014 22:30:44, 12.01.2014 10:13:10, Good
|
HV=150V I=5.3uA
centered position, HV scan
5GeV beam, 6 samples |
Sat Jan 11 20:56:29 2014, Markus Friedl, AIDA, run, run053, 100k, 11.01.2014 20:55:29, 11.01.2014 22:25:43, Good
|
HV=140V I=7.1uA
centered position, HV scan
5GeV beam, 6 samples |
Fri Jan 10 13:04:49 2014, Markus Friedl, AIDA, run, run052, 100k, 10.01.2014 13:04:05, 10.01.2014 14:30:18, Good
|
HV=130V I=4.6uA
centered position, HV scan
5GeV beam, 6 samples |
Fri Jan 10 11:26:54 2014, Markus Friedl, AIDA, run, run051, 100k, 10.01.2014 11:26:08, 10.01.2014 12:53:12, Good
|
HV=120V I=4.6uA
centered position, HV scan
5GeV beam, 6 samples |
Fri Jan 10 11:02:31 2014, Markus Friedl, Belle SVD, Power supply, , , 10.01.2014 11:00:00, , Unknown
|
|
|