HV=300V I=9.2uA
position adapted to center beam better (+10mm horizontal)
narrow trigger width (~5ns)
single sample run
Beam energy = 3 GeV
HV=300V I=8.5uA
multi6 with same settings as run019 (htr+3)
HV=100V I=7.2uA
single trigger
HV=150V I=7.3uA
HV=200V I=8.0uA
HV=210V I=8.1uA
HV=220V I=8.1uA
HV=230V I=8.2uA
HV=240V I=8.2uA
HV=250V I=8.3uA
HV=260V I=8.7uA
HV=270V I=8.6uA
HV=280V I=8.4uA
HV=290V I=8.3uA
HV=300V I=8.3uA
beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.
Exchanged AIDA stack with modified Infineon Stack
Configuration:
Beam Infineon_TB_2014_Baby1(P0) --- Inifineon_TB_2014_Baby2(P1) ||| Infineon_TB_2012_Baby2(P2) --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0) --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---
HV at 300V; I at app. 11µA 4GeV, Single mode
Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)
-> HV connection will be checked at next opportunity to enter area.
HV 300V, I ca. 11µA single mode
HV 300V, I 10µA
Beam Energy changed during the run between 2GeV - 5GeV - 4GeV
Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93
Beam Energy 4GeV
Latency changed to 93