Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 2 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Jan 7 11:52:27 2014, Markus Friedl, Infineon, run, run019, 650k, 07.01.2014 11:47:24, 07.01.2014 13:15:21, Good 

HV=300V  I=9.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single sample run

Beam energy = 3 GeV

Entry  Tue Jan 7 13:20:48 2014, Markus Friedl, Infineon, run, run020, 300k, 07.01.2014 13:18:52, 07.01.2014 14:35:49, Good 

HV=300V  I=8.5uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

multi6 with same settings as run019 (htr+3)

Beam energy = 3 GeV

Entry  Tue Jan 7 14:47:38 2014, Markus Friedl, Infineon, run, run021, 200k, 07.01.2014 14:46:08, 07.01.2014 15:13:23, Good 

HV=100V  I=7.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 15:16:11 2014, Markus Friedl, Infineon, run, run022, 200k, 07.01.2014 15:15:09, 07.01.2014 15:42:17, Good 

HV=150V  I=7.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 15:54:22 2014, Markus Friedl, Infineon, run, run023, 200k, 07.01.2014 15:53:06, 07.01.2014 16:25:26, Good 

HV=200V  I=8.0uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 16:36:49 2014, Markus Friedl, Infineon, run, run024, 200k, 07.01.2014 16:35:44, 07.01.2014 17:03:10, Good 

HV=210V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 17:09:56 2014, Markus Friedl, Infineon, run, run025, 200k, 07.01.2014 17:08:54, 07.01.2014 17:36:12, Good 

HV=220V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 17:39:20 2014, Markus Friedl, Infineon, run, run026, 200k, 07.01.2014 17:38:01, 07.01.2014 18:05:11, Good 

HV=230V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 18:11:52 2014, Markus Friedl, Infineon, run, run027, 200k, 07.01.2014 18:10:45, 07.01.2014 18:37:42, Good 

HV=240V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 18:41:55 2014, Markus Friedl, Infineon, run, run028, 200k, 07.01.2014 18:40:40, 07.01.2014 19:07:32, Good 

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 19:12:07 2014, Markus Friedl, Infineon, run, run029, 200k, 07.01.2014 19:11:05, 07.01.2014 19:38:00, Good 

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 19:44:45 2014, Markus Friedl, Infineon, run, run030, 200k, 07.01.2014 19:43:35, 07.01.2014 20:11:03, Good 

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 20:26:50 2014, Markus Friedl, Infineon, run, run031, 200k, 07.01.2014 20:25:32, 07.01.2014 20:58:47, Good 

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 21:02:58 2014, Markus Friedl, Infineon, run, run032, 200k, 07.01.2014 21:01:42, 07.01.2014 21:29:03, Good 

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 21:34:41 2014, Markus Friedl, Infineon, run, run033, 4.117.024 (4M), 07.01.2014 21:33:12, 08.01.2014 08:52:37, Good 

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

Entry  Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good 

Exchanged AIDA stack with modified Infineon Stack

Configuration:

Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0)  --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---

Entry  Sat Jan 25 18:24:03 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_001, 1.05 M, 25.01.2014 10:30, 25.01.2014 15:40, Unknown 

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

Entry  Sat Jan 25 18:28:38 2014, Wolfgang Treberspurg, Infineon, Calibration run Infineon Stack 2, Calibration_Run_Infineon_Stack2_001, 82900, 25.01.2014 10:15, 25.01.2014 10:25, Unknown 

HV 300V, I ca. 11µA single mode

Entry  Sat Jan 25 18:46:32 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_001, 340k, 25.01.2014 16:30, 25.01.2014 18:40, Unknown 

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

Entry  Sat Jan 25 21:14:46 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_002, 230k, 25.01.2014 19:00, 25.01.2014 21:15, Good 

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93

ELOG V3.1.5-fc6679b